flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Eyes wide open: Students can see their new home’s building elements

Reconstruction Awards

Eyes wide open: Students can see their new home’s building elements

The two-phase project revamped an opaque, horseshoe-shaped labyrinth of seven buildings from the ’60s and ’70s.


By Robert Cassidy, Executive Editor | November 20, 2017

The light-filled, five-story atrium connects the new addition with the existing building and provides gathering space for students. Photo: Jon Miller – Hedrich Blessing Photographers

“Engineering on display.” That was the theme for the 119,500-sf renovation and 197,000 sf of new construction of the University of Calgary’s engineering school. Instead of hiding MEP and structural elements, the design team of Diamond Schmitt Architects and Gibbs Gage Architects exposed them to students’ view, thereby celebrating them as a learning mechanism.

The two-phase project, which kicked off in 2009 and is on target for LEED Gold certification, revamped an opaque, horseshoe-shaped labyrinth of seven buildings from the ’60s and ’70s into a unified, daylight-filled complex with a new central hub, upgraded labs and classrooms, improved circulation, and a new, welcoming front door.

Numerous building code, seismic, and accessibility improvements were made—lighting and sprinkler system upgrades, window replacements, etc. Five lecture theatres were refurbished; two 240-seat rooms were added to the complex.

Reconstruction Awards jurors were impressed with the three-story-high structural glass entry hall. Structural engineer RJC Engineering supported the entry hall with two 56-foot-high cross braces that extend through large openings in the main floor down to the basement. The cross braces—the only vertical supporting members in the entryway—double as a graphic feature. They also support a system of lattice trusses to carry the cantilevered structural glass.

The design team employed the latest computer-modeling techniques for the much-needed seismic upgrade, but further developed systems that addressed predicted structural concerns related to the limitations of the existing structures. This reduced the amount of new construction, saving costs and time.

The jurors praised the team for using its expertise and experience to turn a complex structural problem into a readily constructible, aesthetically pleasing solution.

 

Project Summary

 

Silver Award Winner

Building Team: Diamond Schmitt Architects (submitting firm, architect) Gibbs Gage Architects (joint venture architect) RJC Engineering (SE) SNC Lavalin (ME) Stebnicki & Partners (EE) EllisDon (CM).

Details: 316,500 sf. Total cost: CDN $174 million. Construction time: April 2009 to September 2016 (two phases). Delivery method: Construction manager.

 

See all of the 2017 Reconstruction Award winners here

Related Stories

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Marilyn I. Walker School of Fine and Performing Arts, Brock University

The five-story brick-and-beam structure is an adaptive reuse of the Canada Hair Cloth Building, where coat linings and parachute silks were once made.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Marwen

Marwen currently offers 100 studio courses to 850 underserved students from 295 schools and 53 zip codes.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: The Cigar Factory

The Cigar Factory was originally a cotton mill but became the home of the American Cigar Company in 1912. 

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: St. Patrick's Cathedral

The cathedral, dedicated in 1879, sorely needed work.

Reconstruction Awards | Nov 15, 2016

Reconstruction Awards: Lovejoy Wharf

After demolishing the rotten wood wharf, Suffolk Construction (GC) built a new 30,000-sf landscaped quay, now known as Lovejoy Wharf.

Reconstruction Awards | Nov 15, 2016

Reconstruction Awards: KETV-7 Burlington Station

The 1898 Greek Revival train terminal, which was listed on the National Register of Historic Places in 1974, had been abandoned for nearly four decades.

Reconstruction Awards | Nov 14, 2016

Reconstruction Awards: The Gallery at the Three Arts Club

On the exterior of the building, masonry and terra cotta were revitalized, and ugly fire escapes on the south façade were removed.

Reconstruction Awards | Nov 14, 2016

Big-box store rescaled to serve as a preventive-care clinic

The hospital was attracted to the big box’s footprint: one level with wide spans between structural columns, which would facilitate a floor plan with open, flexible workspaces and modules that could incorporate labs, X-ray, ultrasound, pharmacy, and rehab therapy functions.

Reconstruction Awards | Nov 14, 2016

Fire-charred synagogue rises to renewed glory

The blaze left the 110-year-old synagogue a charred shell, its structural integrity severely compromised. 

Reconstruction Awards | Nov 11, 2016

Adaptive reuse juices up an abandoned power plant

The power plant was on the National Register of Historic Places and is a Recorded Texas Historic Landmark.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021