The expansion of colorado college’s Tutt Library doubled its size to 94,000 sf, making it likely to be named the nation’s largest 24/7 net-zero academic library. The project reinforces the college’s commitment to achieving campus-wide carbon neutrality by 2020.
Designed in Brutalist style by Chicago architect Walter Netsch (1920–2008), Tutt Library opened in 1961. Aligning the floors of the two new additions with those of the existing concrete structure and accommodating new systems—HVAC, sprinklers, lighting—proved to be the most nettlesome problem for the project team.
The west-side expansion added a formal entry plaza and three new entrances to the first floor, plus a Data Viz Lab, flex space, and entry lounge. The east-side renovation opened up the circulation desk and created a technology space with a GIS lab and tech “sandbox.”
The second-floor expansion created a flexible event space that opens, via a glass NanaWall, onto an outdoor terrace. The library’s research center, reimagined as the Colket Center for Academic Excellence, retains Netsch’s double-height volume and reenergizes the space with color and technology. The eastern addition provides new space for library administration.
The third-floor expansion added a café and outdoor terrace (with views of Pikes Peak) and extended an existing concrete slab for an overlook that doubles as a study counter.
The fourth-floor addition opened up a spacious reading room with floor-to-ceiling glazing and an outdoor terrace. A 115-kW array of 318 solar panels resides on the roof and off campus. Eighty 400-foot-deep geothermal wells were drilled in the campus’s restored Armstrong Quad.
Net-zero confirmation is scheduled for next fall.
Photo: Steve Lerum Photography.
Gold Award Winner
BUILDING TEAM Pfeiffer (submitting firm, architect) Colorado College (owner) HCDA Engineering (SE) Farris Engineering (MEP) GH Phipps (GC) DETAILS 94,000 sf Total cost $45 million Construction time April 2016 to August 2017 Delivery method CMGC with GMP
CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE
Related Stories
Reconstruction Awards | Nov 27, 2018
Bedford Square: Revivifying urbanity
A suburban mixed-use redevelopment restores ‘the lost art of living closely.'
Reconstruction Awards | Nov 26, 2018
Yarn works: Neverending yarn
111-year-old mill becomes a mixed-income multifamily community.
Reconstruction Awards | Nov 20, 2018
Wiseburn High School: New kind of P3
A California school district and a charter school system join forces to open a skills-based high school.
Reconstruction Awards | Nov 19, 2018
Kehoe Iron Works: Industrial strength makeover
A project team turns a toxic site into a civic treasure.
Reconstruction Awards | Nov 19, 2018
Weiser Hall, University of Michigan: Campus upgrade
A Mid-century building becomes home to a new International Institute.
Reconstruction Awards | Nov 16, 2018
Mass MoCA Building 6: The Robert W. Wilson Building
A textile mill becomes an arts center that energizes a New England town and its region.
Reconstruction Awards | Nov 14, 2018
National Arts Centre: O, Canada
Three new wings and a flashy AV display add luster to the nation’s cultural gem.
Reconstruction Awards | Nov 13, 2018
20 Times Square: Conquering Times Square
The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.
Reconstruction Awards | Nov 12, 2018
Crosstown Concourse: An 'organic' urban village
Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.
Reconstruction Awards | Nov 12, 2018
Cincinnati Music Hall: Saving a cultural anchor
Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.