flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Reconstruction Awards

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.


By John Caulfield, Senior Editor | November 15, 2018
Charles L. Tutt Library

The renovation of the Charles L. Tutt Library followed goals set out in a long-range development plan regarding open space and the transition between interior and exterior spaces. Photo: Steve Lerum Photography.

The expansion of colorado college’s Tutt Library doubled its size to 94,000 sf, making it likely to be named the nation’s largest 24/7 net-zero academic library. The project reinforces the college’s commitment to achieving campus-wide carbon neutrality by 2020.

Designed in Brutalist style by Chicago architect Walter Netsch (1920–2008), Tutt Library opened in 1961. Aligning the floors of the two new additions with those of the existing concrete structure and accommodating new systems—HVAC, sprinklers, lighting—proved to be the most nettlesome problem for the project team. 

The west-side expansion added a formal entry plaza and three new entrances to the first floor, plus a Data Viz Lab, flex space, and entry lounge. The east-side renovation opened up the circulation desk and created a technology space with a GIS lab and tech “sandbox.”

The second-floor expansion created a flexible event space that opens, via a glass NanaWall, onto an outdoor terrace. The library’s research center, reimagined as the Colket Center for Academic Excellence, retains Netsch’s double-height volume and reenergizes the space with color and technology. The eastern addition provides new space for library administration.

The third-floor expansion added a café and outdoor terrace (with views of Pikes Peak) and extended an existing concrete slab for an overlook that doubles as a study counter.

The fourth-floor addition opened up a spacious reading room with floor-to-ceiling glazing and an outdoor terrace. A 115-kW array of 318 solar panels resides on the roof and off campus. Eighty 400-foot-deep geothermal wells were drilled in the campus’s restored Armstrong Quad.

Net-zero confirmation is scheduled for next fall.

 

Tutt Library exteriorPhoto: Steve Lerum Photography.

 

Gold Award Winner

BUILDING TEAM Pfeiffer (submitting firm, architect) Colorado College (owner) HCDA Engineering (SE) Farris Engineering (MEP) GH Phipps (GC) DETAILS 94,000 sf Total cost $45 million Construction time April 2016 to August 2017 Delivery method CMGC with GMP

 

CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE

Related Stories

Reconstruction Awards | Nov 11, 2019

Woolworth Tower Residences: What a view!

The one-time tallest building in the world is now home to an exclusive residential clientele.

Reconstruction Awards | Nov 8, 2019

2019 Reconstruction Awards: The 1060 Project at Wrigley Field

Venerable Wrigley Field is raised up in a top-to-bottom restoration that took five years to complete.

Reconstruction Awards | Nov 6, 2019

2019 Reconstruction Awards: Betting on a city's future

Can a new resort and casino pump life into a city once renowned as the nation’s arms maker?

Reconstruction Awards | Dec 4, 2018

BD+C's 2018 Reconstruction Award Winners

Cincinnati Music Hall, MASS MoCA Building 6, and 20 Times Square are just a few of the projects recognized as 2018 Reconstruction Award winners.

Reconstruction Awards | Dec 3, 2018

2018 Reconstruction Awards: Honorable mentions

These four projects won honorable mentions in BD+C's 2018 Reconstruction Awards.

Reconstruction Awards | Dec 3, 2018

Elgin Tower: Elgin's heart beats again

A project team brings this Chicago suburb’s landmark tower back to life.

Reconstruction Awards | Nov 30, 2018

Hawaiian Dredging Construction Company Building: GC to the rescue

Hawaii’s largest contractor saves one of the state’s prized architectural landmarks—and now calls it home.

Reconstruction Awards | Nov 30, 2018

5 Beekman Hotel and Residences: Back in business

A landmark office tower becomes one of N.Y.’s hottest lifestyle hotel destinations.

Reconstruction Awards | Nov 29, 2018

700 Constitution: Healthy living

Hospital turned apartment brings luxury living to a D.C. neighborhood – and saves a valued piece of architecture.

Reconstruction Awards | Nov 28, 2018

IBEW Local 134 Union Hall: Union lights a 'beacon'

Electrical workers’ local converts an abandoned Chicago school into a brightly lit union hall.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021