flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer

Reconstruction Awards

Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer

The project team had to fix poor renovations made in the ’50s.


By Robert Cassidy, Executive Editor | November 27, 2017
 The renovated entry with custom-made replica columns

 The renovated entry with custom-made replica columns. The original columns were removed in the 1950s.

Capstone Real Estate Investments bought the circa-1920s Birmingham branch of the Federal Reserve Bank of Atlanta and its 1950s-era annex in 2014. The property had been vacant for 14 years. Instead of tearing everything down and starting all over, Capstone and its design-build team, led by Hoar Construction and Williams Blackstock Architects, saved a piece of downtown Birmingham for future generations,
earning $7 million in tax credits along the way.

The project team had to fix poor renovations made in the ’50s. The marble floor in the lobby, which had been replaced by terrazzo, was restored to its original marble floor pattern.

Three big windows that had been bricked over were replaced with new, historically accurate replicas.

Unique steel vaults with massive doors were salvaged. To allow for venting and utility lines, laborers had to cut through the rebar and wire mesh in the walls with a special wire saw. One tenant converted its vault into a bar and kitchenette.

 

Project Summary

 

Bronze Award Winner

Building Team: Hoar Construction (submitting firm, GC) Williams Blackstock Architects (architect) LYBD (SE) RJ Mechanical Inc. (M/P engineer) Eldeco Inc. (EE).

Details: 90,300 sf. Total cost: $13.7 million. Construction time: November 2015 to December 2016. Delivery method: Design-build.

 

See all of the 2017 Reconstruction Award winners here

Related Stories

Reconstruction Awards | Nov 27, 2018

Bedford Square: Revivifying urbanity

A suburban mixed-use redevelopment restores ‘the lost art of living closely.'

Reconstruction Awards | Nov 26, 2018

Yarn works: Neverending yarn

111-year-old mill becomes a mixed-income multifamily community.

Reconstruction Awards | Nov 20, 2018

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.

Reconstruction Awards | Nov 19, 2018

Kehoe Iron Works: Industrial strength makeover

A project team turns a toxic site into a civic treasure.

Reconstruction Awards | Nov 19, 2018

Weiser Hall, University of Michigan: Campus upgrade

A Mid-century building becomes home to a new International Institute.

Reconstruction Awards | Nov 16, 2018

Mass MoCA Building 6: The Robert W. Wilson Building

A textile mill becomes an arts center that energizes a New England town and its region.

Reconstruction Awards | Nov 15, 2018

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.

Reconstruction Awards | Nov 14, 2018

National Arts Centre: O, Canada

Three new wings and a flashy AV display add luster to the nation’s cultural gem.

Reconstruction Awards | Nov 13, 2018

20 Times Square: Conquering Times Square

The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.

Reconstruction Awards | Nov 12, 2018

Crosstown Concourse: An 'organic' urban village

Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021