flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Traditional installation methods challenged by GC and subcontractor

Sponsored Content Flooring

Traditional installation methods challenged by GC and subcontractor

Time and money are both precious and often too easily compromised on construction projects. This study proves how on one Boston high rise residential tower, correcting unanticipated out-of-spec concrete deflection was solved in 50% less time at 30% less cost. 


By LATICRETE SUPERCAP | June 25, 2018

The Point, aka Pierce Boston is a new 34 story luxury residential tower in the Fenway neighborhood of Boston, home of the Boston Red Sox’ Fenway Park. The LATICRETE SUPERCAP System proved it was the solution to a time, cost and worker safety problem. 

When the general contractor learned that this newly constructed building’s concrete substrate had an average of one-inch deflection, the flooring contractor recommended a cementitious self-leveling underlayment to correct and flatten the floor. The GC anticipated that solving the problem would negatively affect the project schedule - they needed a fast and reliable solution.

Traditional installation methods would be time-consuming, costly and introduce unacceptable levels of respirable silica dust to the jobsite and to worker safety. The flooring contractor, Allegheny Contract, challenged using old, traditional SLU installation methods and recommended using the LATICRETE SUPERCAP system.

Allegheny Contract offered to conduct a monitored side-by-side comparison test using two different premium SLU products.

The General Contractor agreed and selected 2 identical 11,000 SF floor plates:

  • Floor 4: Was installed with 50lb small bags of self-leveling underlayment loaded into the building on pallets and delivered through a traditional barrel mixing system.
  • Floor 5: Was installed with the LATICRETE SUPERCAP System, using 2,300lb supersacks of SC500 material mixed outside the building in a mobile blending unit and pumped through a hose into the building.

 

The Results:

 

The LATICRETE SUPERCAP System had the speed and volume, the mobile blending unit can pump up to 60 stories high, up to 50,000 SF in one day, at a rate of 30,000 lbs. per hour (equivalent to 600 small bags an hour). The only thing that goes into the building is a hose, no silica dust inside or outside the building. The projects LVT and wood floor flatness specs were easily met and the project stayed on schedule. The goal of providing a fast and cost-effective solution was achieved.

 

 

For more information, contact LATICRETE SUPERCAP at (866) 704-2247 or email us at info@laticretesupercap.com, or visit www.laticretesupercap.com

 

To view a project video of another LATICRETE SUPERCAP System Solution, visit: https://laticretesupercap.com/en/features-support/project-spotlights/colorado-mills-mall

Tags

Related Stories

| Jun 19, 2013

NSF Sustainability begins verifying EPDs that can be used for LEED V4

NSF Sustainability has verified Environmental Product Declarations (EPDs) for nylon carpet styles and colors manufactured by Mannington Commercial and for J+J Flooring Group’s Kinetex® flooring product and Invision brand modular styles that use eKo® backing.  

| May 21, 2013

7 tile trends for 2013: Touch-sensitive glazes, metallic tones among top styles

Tile of Spain consultant and ceramic tile expert Ryan Fasan presented his "What's Trending in Tile" roundup at the Coverings 2013 show in Atlanta earlier this month. Here's an overview of Fasan's emerging tile trends for 2013.

| Mar 23, 2013

A warm welcome at Roswell Park Cancer Institute

The Roswell Park Cancer Institute (RPCI) in Buffalo, N.Y., is the only upstate New York facility to hold the National Cancer Center Institute designation of “comprehensive cancer center” and to serve as a member of the prestigious National Comprehensive Cancer Network.

| Feb 28, 2013

Lend Lease builds world's tallest timber apartment building

Construction giant Lend Lease recently put the finishing touches on Forté, a 10-story apartment complex in Melbourne, Australia's Victoria Harbour that was built entirely with cross laminated timber (CTL) technology.

| Feb 25, 2013

Turner employs rare 'collapsible' steel truss system at Seattle light rail station

To speed construction of the $110 million Capitol Hill Station light-rail station in Seattle, general contractor Turner Construction will use an unusual temporary framing method for the project's underground spaces.

| Feb 21, 2013

Long-tenured Centria employee receives promotion

H.H. Robertson Floor Systems, a CENTRIA company, is pleased to announce the promotion of Kevin Daily to leader of the division. Daily, a 40-year veteran with CENTRIA, replaces former leader, Al Smith, who retired after 51 years with the company.

| Jan 30, 2013

New polling feature encourages member feedback in the noraXchange, nora flooring’s online community

Honoring its commitment to connect with facility managers, architects, designers, installers, other building professionals and key decision makers in meaningful ways, nora® flooring has introduced a polling feature to noraXchange, the interactive online community hosted by nora systems, Inc. The noraXchange provides customers with information that addresses the challenges and questions they regularly encounter in their work.

| Jan 3, 2013

5 things you should know about decorative concrete

Designing and installing decorative concrete is a lot more difficult that you might think. A veteran of many such installations offers a handful of tips to help you plan your next decorative concrete project.

| Oct 23, 2012

Actions Floor Systems rolls out solution for retrofit floors

Action Floor Systems’ Herculan IG synthetic flooring offers a cost-effective solution to commercial requirements and has applications for countless environments.

| Oct 13, 2012

October 2012: Product Spotlight

Carpeting collection; anti-slip synthetic roof underlayment; louver screens.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021