Traditional installation methods challenged by GC and subcontractor

Sponsored Content Flooring

Traditional installation methods challenged by GC and subcontractor

Time and money are both precious and often too easily compromised on construction projects. This study proves how on one Boston high rise residential tower, correcting unanticipated out-of-spec concrete deflection was solved in 50% less time at 30% less cost. 


By LATICRETE SUPERCAP | June 25, 2018

The Point, aka Pierce Boston is a new 34 story luxury residential tower in the Fenway neighborhood of Boston, home of the Boston Red Sox’ Fenway Park. The LATICRETE SUPERCAP System proved it was the solution to a time, cost and worker safety problem. 

When the general contractor learned that this newly constructed building’s concrete substrate had an average of one-inch deflection, the flooring contractor recommended a cementitious self-leveling underlayment to correct and flatten the floor. The GC anticipated that solving the problem would negatively affect the project schedule - they needed a fast and reliable solution.

Traditional installation methods would be time-consuming, costly and introduce unacceptable levels of respirable silica dust to the jobsite and to worker safety. The flooring contractor, Allegheny Contract, challenged using old, traditional SLU installation methods and recommended using the LATICRETE SUPERCAP system.

Allegheny Contract offered to conduct a monitored side-by-side comparison test using two different premium SLU products.

The General Contractor agreed and selected 2 identical 11,000 SF floor plates:

  • Floor 4: Was installed with 50lb small bags of self-leveling underlayment loaded into the building on pallets and delivered through a traditional barrel mixing system.
  • Floor 5: Was installed with the LATICRETE SUPERCAP System, using 2,300lb supersacks of SC500 material mixed outside the building in a mobile blending unit and pumped through a hose into the building.

 

The Results:

 

The LATICRETE SUPERCAP System had the speed and volume, the mobile blending unit can pump up to 60 stories high, up to 50,000 SF in one day, at a rate of 30,000 lbs. per hour (equivalent to 600 small bags an hour). The only thing that goes into the building is a hose, no silica dust inside or outside the building. The projects LVT and wood floor flatness specs were easily met and the project stayed on schedule. The goal of providing a fast and cost-effective solution was achieved.

 

 

For more information, contact LATICRETE SUPERCAP at (866) 704-2247 or email us at info@laticretesupercap.com, or visit www.laticretesupercap.com

 

To view a project video of another LATICRETE SUPERCAP System Solution, visit: https://laticretesupercap.com/en/features-support/project-spotlights/colorado-mills-mall

Tags

Related Stories

Sponsored | Flooring | May 18, 2015

Suburban L.A. high school battles moisture-soaked flooring

School officials had to take action when popped flooring created trip hazards

Sponsored | Fire-Rated Products | Dec 11, 2014

Fire rated glazing provides visual appeal and safety to garages

When it comes to designing parking garages, providing vision and transparency might not be the priority due to fire rated code requirements – but keen architects with grand visions see opportunities rather than restrictions, thanks to the advances in fire rated glass and framing technology.

| Oct 30, 2014

CannonDesign releases guide for specifying flooring in healthcare settings

The new report, "Flooring Applications in Healthcare Settings," compares and contrasts different flooring types in the context of parameters such as health and safety impact, design and operational issues, environmental considerations, economics, and product options.

| Jul 24, 2014

MIT researchers explore how to make wood composite-like blocks of bamboo

The concept behind the research is to slice the stalk of bamboo grass into smaller pieces to bond together and form sturdy blocks, much like conventional wood composites.

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

Sponsored | | Mar 21, 2014

Nationwide Children’s Hospital combines advanced technology and colorful design

A key component of the facility’s interior design is a comprehensive and colorful flooring design, consisting of arcs and curves.

| Mar 12, 2014

nora Technical Academy Certifies 1,400 Installers and Counting

Program marks six years of hands-on installation training with 2014 class schedule

| Mar 5, 2014

5 tile design trends for 2014

Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.

| Jan 21, 2014

Dur-A-Flex’s New Accelera Fast Track Flooring System Helps Contractors Increase Efficiency, Profitability and Allows Facility Owners to Minimize Downtime

Dur-A-Flex, Inc., a leading manufacturer of commercial, industrial and institutional seamless, resinous flooring, has released Accelera Fast Track Flooring, the newest in its lineup of performance systems.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021