flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: Bay Area Metro Center

Reconstruction Awards

Reconstruction Awards: Bay Area Metro Center

The structure’s 60,000-sf floor plates made the interior dark and foreboding, and BAHA wanted to improve working conditions for its employees and tenants. 


By BD+C Staff | November 16, 2016

The newly constructed eight-story atrium in the Bay Area Metro Center provides occupants with welcome daylight. The project is targeting LEED Gold certification. Mikki P. Green/ Mikki Piper Imaging.

The 525,000-sf Bay Area Metro Center, at 390 Main Street, San Francisco, was originally built by the federal government in 1942 to make armored vehicles. Three years ago, the owner, Bay Area Headquarters Authority, commissioned McCarthy Building Companies to lead a much-needed seismic upgrade and structural renovation. The structure’s 60,000-sf floor plates also made the interior dark and foreboding, and BAHA wanted to improve working conditions for its employees and tenants. 

The centerpiece is an eight-story atrium that brings natural light into the offices of BAHA, the Bay Area Toll Authority, the Metropolitan Transportation Commission, the Bay Area Air Quality Management District, the Association of Bay Area Governments, and the U.S. Drug Enforcement Agency.

The seismic upgrade meant that the contractor would have to drill 27,000 holes into the thick interior concrete walls and floor—a considerable safety risk. McCarthy worked with a team from UC San Francisco, UC Berkeley, and toolmaker Hilti to design a dual-headed drill rig that reduced worker fatigue and the volume of airborne concrete dust kicked up by the drilling.
Zero accidents were recorded.

 

PROJECT SUMMARY 

 

Silver Award Winner | San Francisco, Calif.

Building Team: McCarthy Building Companies (submitting firm, GC); Bay Area Headquarters Authority (owner); Perkins+Will (architect); TEF Design (interior architect); Holmes Culley (SE); WSP | Parsons Brinckerhoff (MEP); TEECOM (communications); and Harris & Associates (CM).

Details: 525,000 sf. Construction cost: $115 million. Construction time: January 2013 to April 2016. Delivery method: CM at risk.

Related Stories

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Marilyn I. Walker School of Fine and Performing Arts, Brock University

The five-story brick-and-beam structure is an adaptive reuse of the Canada Hair Cloth Building, where coat linings and parachute silks were once made.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Marwen

Marwen currently offers 100 studio courses to 850 underserved students from 295 schools and 53 zip codes.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: The Cigar Factory

The Cigar Factory was originally a cotton mill but became the home of the American Cigar Company in 1912. 

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: St. Patrick's Cathedral

The cathedral, dedicated in 1879, sorely needed work.

Reconstruction Awards | Nov 15, 2016

Reconstruction Awards: Lovejoy Wharf

After demolishing the rotten wood wharf, Suffolk Construction (GC) built a new 30,000-sf landscaped quay, now known as Lovejoy Wharf.

Reconstruction Awards | Nov 15, 2016

Reconstruction Awards: KETV-7 Burlington Station

The 1898 Greek Revival train terminal, which was listed on the National Register of Historic Places in 1974, had been abandoned for nearly four decades.

Reconstruction Awards | Nov 14, 2016

Reconstruction Awards: The Gallery at the Three Arts Club

On the exterior of the building, masonry and terra cotta were revitalized, and ugly fire escapes on the south façade were removed.

Reconstruction Awards | Nov 14, 2016

Big-box store rescaled to serve as a preventive-care clinic

The hospital was attracted to the big box’s footprint: one level with wide spans between structural columns, which would facilitate a floor plan with open, flexible workspaces and modules that could incorporate labs, X-ray, ultrasound, pharmacy, and rehab therapy functions.

Reconstruction Awards | Nov 14, 2016

Fire-charred synagogue rises to renewed glory

The blaze left the 110-year-old synagogue a charred shell, its structural integrity severely compromised. 

Reconstruction Awards | Nov 11, 2016

Adaptive reuse juices up an abandoned power plant

The power plant was on the National Register of Historic Places and is a Recorded Texas Historic Landmark.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021