flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

5 Beekman Hotel and Residences: Back in business

Reconstruction Awards

5 Beekman Hotel and Residences: Back in business

A landmark office tower becomes one of N.Y.’s hottest lifestyle hotel destinations.


By David Barista, Editorial Director | November 30, 2018
The restored Beekman Hotel

The restored Beekman Hotel (at left in photo) and the adjoining new 51-story luxury residential tower. Photo: 5 Beekman Property Owner.

When it opened in 1883, the nine-story Temple Court Building was one of the tallest buildings in New York City, and one of the first with a soaring, open atrium at its center. The red-brick and terra cotta office building was commissioned by dry-goods retailer and banker Eugene Kelly to house law practices. Its signature turrets were trendsetting at the time—the Woolworth Building adopted similar architectural elements some 30 years later.

Temple Court and its Annex (1890) were designated a New York City landmark in 1998, to no avail: the last tenant moved out at the end of 2001.

In 2012, a development group led by Allen Gross, President of GFI Capital Resources, purchased the property and set a plan to revive it for hotel/retail use, along with the construction of a ground-up, 51-story residential tower on the adjacent lot. The bottom 10 floors of the new tower adjoin the historic property; both house hotels rooms. The upper 41 floors of the tower contain 67 luxury condos and amenities spaces. Beekman Hotel and Residences was fully completed earlier this year.

Key to the landmark building’s revival was overcoming a tenuous fire code issue that forced its previous owners, in the 1940s, to fully enclose the dramatic open atrium with walls, hiding the atrium, railings, and skylight from view. The team worked with the NYC fire department and the Landmarks Preservation Commission to implement a novel $2 million smoke curtain system—the first of its kind in North America—that permitted the obtrusive atrium walls to come down. Curtains were installed on every floor to ensure that smoke would be contained in case of a fire. Fans on the roof and a smoke purge system draw fresh air in via the ground-floor windows and doors.

The team faced other technical problems: inadequate MEP infrastructure (solution: place all mechanical systems in the new tower); varying floor heights (solution: design the tower’s lower floors to align seamlessly); and spotty vertical access throughout construction (solution: careful planning of materials delivery and project sequencing).

The Beekman Hotel opened in September 2016. It was an instant hit. As one guest put it, “What you will find throughout the property are surprises and delight. The attention to detail is what strikes you first, and then the pure class and elegance.”

 

 

Bronze Award Winner

BUILDING TEAM Broadway Construction Group (submitter, GC) 5 Beekman Property Owner, LLC (owner) Gerner Kronick & Valcarcel (architect) Martin Brudnizki Design Studio (interior architect) WSP (SE) PHA Engineering (CE) Lilker Associates (MEP) Mueser Rutledge Consulting Engineers (geotechnical engineer) DETAILS 350,000 sf Total cost $400 million Construction time 2013 to 2018 Delivery method Cost plus

 

CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE

Related Stories

Reconstruction Awards | Nov 26, 2018

Yarn works: Neverending yarn

111-year-old mill becomes a mixed-income multifamily community.

Reconstruction Awards | Nov 20, 2018

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.

Reconstruction Awards | Nov 19, 2018

Kehoe Iron Works: Industrial strength makeover

A project team turns a toxic site into a civic treasure.

Reconstruction Awards | Nov 19, 2018

Weiser Hall, University of Michigan: Campus upgrade

A Mid-century building becomes home to a new International Institute.

Reconstruction Awards | Nov 16, 2018

Mass MoCA Building 6: The Robert W. Wilson Building

A textile mill becomes an arts center that energizes a New England town and its region.

Reconstruction Awards | Nov 15, 2018

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.

Reconstruction Awards | Nov 14, 2018

National Arts Centre: O, Canada

Three new wings and a flashy AV display add luster to the nation’s cultural gem.

Reconstruction Awards | Nov 13, 2018

20 Times Square: Conquering Times Square

The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.

Reconstruction Awards | Nov 12, 2018

Crosstown Concourse: An 'organic' urban village

Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.

Reconstruction Awards | Nov 12, 2018

Cincinnati Music Hall: Saving a cultural anchor

Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021