Virgin Trains has officially broken ground on the country’s largest privately funded infrastructure project to expand passenger rail service to Orlando.
The company is developing 170 miles of new track into the completed intermodal facility located in the new South Terminal at the Orlando International Airport as part of phase 2 of its expansion into Central Florida. The project encompasses four zones including the area of the Orlando International Airport and the Virgin Trains Maintenance Facility. It will use 225 million pounds of American steel, will include the laying of 490,000 ties, and the transporting of 2.35 million tons of granite and limestone by 20,000 railcars.
Service is expected to begin in 2022, with Virgin Trains projecting over six million annual riders in Florida and $6.4 billion in direct economic impact. The project between South and Central Florida will generate more than 10,000 jobs and over $650 million in federal, state, and local tax revenue over an eight year period.
Check out the Orlando Virgin Trains groundbreaking event video
The Intermodal Terminal Facility at Orlando International Airport comprises 1.3 million sf of terminal space accommodating the airport’s South Airport Automated People Mover and up to three regional rail systems: Virgin Trains, SunRail, and possibly a third system serving the Orange County Convention Center/International Drive area.
Meanwhile, the Virgin Maintenance Facility is a 200,000-sf building that includes six miles of maintenance and storage track at Boggy Street Road and Weatherbee. It features a deep pit for removing and replacing wheel trucks, a 30-ton overhead crane for removing heavy train components, a 60,000 gallon fuel farm, a train wash facility, and wheel truing capability.
Virgin Trains, formerly Brightline, announced a strategic partnership and trademark licensing agreement with the Virgin Group in November 2018.
Related Stories
| May 1, 2014
Super BIM: 7 award-winning BIM/VDC-driven projects
Thom Mayne's Perot Museum of Nature and Science and Anaheim's new intermodal center are among the 2014 AIA TAP BIM Award winners.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Free transit for everyone! Then again, maybe not
An interesting experiment is taking place in Tallinn, the capital of Estonia, where, for the last year or so, its 430,000 residents have been able to ride the city’s transit lines practically for free. City officials hope to pump up ridership by 20%, cut carbon emissions, and give low-income Tallinnites greater access to job opportunities. But is it working?
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 19, 2014
Frames: the biggest value engineering tip
In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.