Virgin Trains has officially broken ground on the country’s largest privately funded infrastructure project to expand passenger rail service to Orlando.
The company is developing 170 miles of new track into the completed intermodal facility located in the new South Terminal at the Orlando International Airport as part of phase 2 of its expansion into Central Florida. The project encompasses four zones including the area of the Orlando International Airport and the Virgin Trains Maintenance Facility. It will use 225 million pounds of American steel, will include the laying of 490,000 ties, and the transporting of 2.35 million tons of granite and limestone by 20,000 railcars.
Service is expected to begin in 2022, with Virgin Trains projecting over six million annual riders in Florida and $6.4 billion in direct economic impact. The project between South and Central Florida will generate more than 10,000 jobs and over $650 million in federal, state, and local tax revenue over an eight year period.
Check out the Orlando Virgin Trains groundbreaking event video
The Intermodal Terminal Facility at Orlando International Airport comprises 1.3 million sf of terminal space accommodating the airport’s South Airport Automated People Mover and up to three regional rail systems: Virgin Trains, SunRail, and possibly a third system serving the Orange County Convention Center/International Drive area.
Meanwhile, the Virgin Maintenance Facility is a 200,000-sf building that includes six miles of maintenance and storage track at Boggy Street Road and Weatherbee. It features a deep pit for removing and replacing wheel trucks, a 30-ton overhead crane for removing heavy train components, a 60,000 gallon fuel farm, a train wash facility, and wheel truing capability.
Virgin Trains, formerly Brightline, announced a strategic partnership and trademark licensing agreement with the Virgin Group in November 2018.
Related Stories
| Aug 11, 2010
Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms
A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
GSA celebrates 60th anniversary
The U.S. General Services Administration today is commemorating its 60th anniversary as it engages in one of its its most challenging assignments ever—helping to achieve the goals of the American Recovery and Reinvestment Act.
| Aug 11, 2010
Earthquake engineering keeps airport grounded
Istanbul, Turkey's new 2.15 million-sf Sabiha Gökçen International Airport opened on October 31, 2009, becoming the world's largest seismically isolated building. Arup's global airport planning and engineering team, in collaboration with architects Dogan Tekeli Sami Sisa Mimarlik Ofisi and contractor LIMAK-GMR JV, working within an 18-month timeline, designed and built the facility wi...
| Aug 11, 2010
Manhattan's Pier 57 to be transformed into $210 million cultural center
LOT-EK, Beyer Blinder Belle, and West 8 have been selected as the design team for Hudson River Park's $210 million Pier 57 redevelopment, headed by local developer Young Woo & Associates. The 375,000-sf vacant passenger ship terminal will be transformed into a cultural center, small business incubator, and public park, including a rooftop venue for the Tribeca Film Festival.
| Aug 11, 2010
Special Recognition: Triple Bridge Gateway, Port Authority Bus Terminal New York, N.Y.
Judges saw the Triple Bridge Gateway in Midtown Manhattan as more art installation than building project, but they were impressed at how the illuminated ramps and bridges—14 years in the making—turned an ugly intersection into something beautiful. The three bridges span 9th Avenue at the juncture where vehicles emerge from the Lincoln Tunnel heading to the Port Authority of New Yor...
| Aug 11, 2010
29 Great Solutions
1. Riverwalk Transforms Chicago's Second Waterfront Chicago has long enjoyed a beautiful waterfront along Lake Michigan, but the Windy City's second waterfront along the Chicago River was often ignored and mostly neglected. Thanks to a $22 million rehab by local architect Carol Ross Barney and her associate John Fried, a 1.