flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Raising the bar: Zurich North American Headquarters

Building Team Awards

Raising the bar: Zurich North American Headquarters

Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.


By David Malone, Associate Editor | June 8, 2017

The top bar of Zurich North America’s headquarters building (right) spans 180 feet and runs along an outdoor terrace that staff and visitors can use to move between the two bottom bars. James Steinkamp Photography.

Like a giant arrow pointing toward downtown Chicago, the top bar of the Zurich North America Headquarters building cantilevers 60 feet to the east and rests atop two other bars. Not only is this stacked, three-bar design striking to look at, it also provides occupants with unique collaboration spaces, open views of the surrounding landscape, and programmatic flexibility that typical center-core buildings cannot offer.

The top bar is 500 feet long and spans 180 feet between the bottom two bars, which each rise five stories.

Sustainability played a key role in the development of the headquarters building, which is the largest building of its kind to reach LEED Platinum certification. When compared to similar buildings, the structure saved 62% in energy costs and 39% in domestic water use. The façade includes exterior shading and interior automated shades with daylight sensors. A double wall mitigates the interior/exterior temperature difference. Floor-to-ceiling glass provides natural light to the shallow office plates. Design-builder Clayco also diverted 99% of construction and demolition waste from landfills.

The complex’s 3,000 employees can enjoy a fitness center, cafeteria, conference center, and outdoor terraces that are all connected via walking trails through the fully landscaped estate. 

The Building Team received more than 1,300 responses from employee surveys that were used to create a truly collaborative environment.

 

James Steinkamp Photography.

 

Building Team – Submitting firm, design-builder Clayco, Inc. Owner Zurich North America Developer CRG Real Estate Solutions Architect Goettsch Partners Interior architect CannonDesign Structural engineer Halvorson and Partners, Desman Inc. Mechanical engineer Icon Mechanical 

General Information – Size 783,000 sf Cost $400 million Construction time June 2014 to September 2016 Delivery method Design-build

 

Return to the 2017 Building Team Awards landing page

Related Stories

Building Team Awards | Nov 2, 2020

Fans come first at Allianz Field

The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 24, 2020

Emory University Student Center wins the top award in 2020 Building Team Awards

Emory University Student Center wins the top award in 2020 Building Team Awards

Building Team Awards | Oct 22, 2020

Look up to the skies

The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.

Building Team Awards | Oct 22, 2020

Judging a book by its cover

The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Oct 21, 2020

Big Room equals big results

Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards. 

Building Team Awards | Oct 21, 2020

New York’s STEM epicenter and career gateway

The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 20, 2020

Seamless speed to market drives Texas hospital’s growth

Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.

Building Team Awards | Oct 20, 2020

Winning with teamwork

The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.

Coronavirus | Oct 8, 2020

The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability

The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021