Like a giant arrow pointing toward downtown Chicago, the top bar of the Zurich North America Headquarters building cantilevers 60 feet to the east and rests atop two other bars. Not only is this stacked, three-bar design striking to look at, it also provides occupants with unique collaboration spaces, open views of the surrounding landscape, and programmatic flexibility that typical center-core buildings cannot offer.
The top bar is 500 feet long and spans 180 feet between the bottom two bars, which each rise five stories.
Sustainability played a key role in the development of the headquarters building, which is the largest building of its kind to reach LEED Platinum certification. When compared to similar buildings, the structure saved 62% in energy costs and 39% in domestic water use. The façade includes exterior shading and interior automated shades with daylight sensors. A double wall mitigates the interior/exterior temperature difference. Floor-to-ceiling glass provides natural light to the shallow office plates. Design-builder Clayco also diverted 99% of construction and demolition waste from landfills.
The complex’s 3,000 employees can enjoy a fitness center, cafeteria, conference center, and outdoor terraces that are all connected via walking trails through the fully landscaped estate.
The Building Team received more than 1,300 responses from employee surveys that were used to create a truly collaborative environment.
James Steinkamp Photography.
Building Team – Submitting firm, design-builder Clayco, Inc. Owner Zurich North America Developer CRG Real Estate Solutions Architect Goettsch Partners Interior architect CannonDesign Structural engineer Halvorson and Partners, Desman Inc. Mechanical engineer Icon Mechanical
General Information – Size 783,000 sf Cost $400 million Construction time June 2014 to September 2016 Delivery method Design-build
Related Stories
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.
Building Team Awards | Jun 21, 2019
Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel
Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.
Building Team Awards | Jun 20, 2019
PPP gets the job done: Three-party deal saves time and money for client
Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.
Building Team Awards | Jun 20, 2019
Making waves: The façade of Pacific Visions suggests the movement of water, day and night
Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.
Building Team Awards | Jun 19, 2019
Unsung heroes: Two hurricanes couldn't stop this project team
Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.
Building Team Awards | Jun 19, 2019
Crime fighter: San Diego County's new forensic facility helps battle crime in three ways
Silver Award: The 158,000-sf addition collocates three crime-fighting functions.
Building Team Awards | Jun 18, 2019
All that urban jazz: Mixed-use center lends a zing to downtown Washington's skyline
Bureaucratic architecture, be damned!
Building Team Awards | Jun 18, 2019
Eyesore no more: People come together to expand a much-needed daycare center
Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
Building Team Awards | Jun 17, 2019
Campus renewal: Community effort saves a crucial healthcare resource
Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).
Building Team Awards | Jun 13, 2019
In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown
Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.