Problem solving in Asheville with R-Trac & ALPOLIC® materials

Sponsored Content Building Materials

Problem solving in Asheville with R-Trac & ALPOLIC® materials

The developers of the recently opened Asheville City Center sought out a cost-effective design that met code requirements while still allowing the building to feel open from the outside.


By ALPOLIC | June 9, 2017

When new energy codes requiring continuous insulation for the building envelope were adopted by the state of North Carolina, the developers of the recently opened Asheville City Center sought out a cost-effective design that met code requirements while still allowing the building to feel open from the outside.

Architects chose tall, thin windows that let light in and prioritized energy efficiency. Spacing the windows evenly apart and flush with the rest of the building’s envelope gave the windows an interesting staggered pattern. Recessing them by three inches provided the building with a sense of depth and dimension.

The architectural team considered insulated metal panels, but for this mid-scale project, ALPOLIC®’s practical, versatile materials proved the better fit for both their vision and their budget.

“With the insulated panels, it’s not cost effective to have many different widths,” architect Aaron Brumo of design firm Clark Nexsen explains. “But with ACM, we could have 100 different size panels if we wanted to. Plus, the panels were available in a wide selection of stock ALPOLIC colors.” 

 

 

Complex Design, Simple Construction, Minimal Cost

The materials were installed using the innovative R-Trac HVHZ pressure-equalized rainscreen system, developed through a collaboration between Mitsubishi Chemical Composites America, Rmax, and Altech Panel Systems. 

In compliance with the latest energy efficiency codes, the R-Trac system works with continuous insulation. It is specifically designed to meet wind loading and missile impact standards for high velocity hurricane zones, and meets the NFPA 285 standard for limiting fire propagation. 

Doug McIntyre, director of research and business development at Altech Panel Systems and the fabricator of this project’s R-Trac system, notes that one advantage of a continuous insulation system with an R-Trac rainscreen is that it’s an all-inclusive system. This reduces costs by eliminating the need to have multiple trades on site. 

 

 

A Perfect Combination

The R-Trac system and ALPOLIC® materials are the perfect marriage of innovative materials and design engineering. Of the R-Trac system, Brumo says: “It really simplifies the design, the assembly of the skin.”

McIntyre notes that ALPOLIC® materials pair perfectly with his company’s innovative rainscreen system.  “We’ve been using ALPOLIC® materials for years,” he says.  “We’ve always felt they have a very good product.  Their colors are, we feel, superior to others in the industry. Quality and service, they’re A-number one.”

For more information, visit www.alpolic-americas.com.

Related Stories

Building Materials | Jun 12, 2015

Construction materials prices up in May, down year-over-year

Prices for inputs to construction industries rose by 1.1% in May—the largest month-over-month increase in more than two years.

Fire and Life Safety | May 27, 2015

7 bold applications and innovations for fire and life safety

BD+C’s roundup features colorful sprinklers for offices, hotels, museums; a fire-rated curtain wall at a transit hub in Manhattan; a combination CO/smoke detector; and more.

BIM and Information Technology | May 27, 2015

4 projects honored with AIA TAP Innovation Awards for excellence in BIM and project delivery

Morphosis Architects' Emerson College building in Los Angeles and the University of Delaware’s ISE Lab are among the projects honored by AIA for their use of BIM/VDC tools.

Sponsored | Building Materials | May 19, 2015

The BYU Life Sciences Building draws inspiration from tectonic forms

Strong, lightweight ALPOLIC materials honor the rugged Wasatch Mountains while standing up to the forces that created them.

Contractors | Apr 29, 2015

Construction costs are expected to remain soft through fall of 2015

Labor and materials haven’t appreciated this year through April, according to market analyst IHS.

Wood | Apr 26, 2015

Building wood towers: How high is up for timber structures?

The recent push for larger and taller wood structures may seem like an architectural fad. But Building Teams around the world are starting to use more large-scale structural wood systems. 

Sponsored | Building Team | Apr 24, 2015

New Products and Programs to Check Out at the 2015 AIA Convention

There is no bigger annual gathering of architects and design professionals in North America quite like the AIA National Convention.

Building Materials | Apr 15, 2015

Prices for construction materials see highest spike in two years

Results from the Bureau of Labor Statistics showed that prices for construction materials rose 0.8% in March, the largest monthly increase in more than two years. 

Building Materials | Apr 14, 2015

French firm proposes sand and bacteria as building material in the Sahara

Deserts are already abundant with sand, so why not construct buildings out of it? This was the thought behind Flohara, a collection of shelters developed by Paris-based XTU Architects.

boombox1 - default
boombox2 -
native1 -

More In Category


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021