flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The lawsuit blocking the construction of Pier 55 has been thrown out

Urban Planning

The lawsuit blocking the construction of Pier 55 has been thrown out

Construction on the $130 million project can now proceed as planned.


By David Malone, Associate Editor | October 27, 2016

Rendering courtesy of Heatherwick Studio

Pier 55, a 2.7 acre park rising above the Hudson River on Manhattan’s lower west side, can move forward without hesitation as the New York Court of Appeals has denied City Club of New York’s motion for leave.

The park, whose construction is being privately funded by Diane Von Furstenberg and Barry Diller, has been embroiled in a legal battle almost from the moment of its conception.

The City Club brought forth the lawsuit arguing that just because the project is being privately funded, that doesn’t mean the basic rules of environmental review, public involvement, and the need for competitive bidding can be ignored. City Club also takes issue with the fact that the park will sit atop 550 piles and rise as high as seven stories above the water, fully obscuring a wide-open view of the Hudson.

 

City Club’s brief focused on the following issues:

  • Failure to do an environmental impact statement
  • Failure to study cumulative impacts of two related projects, Piers 55 and 57
  • Failure to obtain competitive bids
  • Failure to comply with legislation to allow reconstruction of Pier 54
  • Failure to apply the public trust doctrine, particularly to ensure open public access

 

City Club says it got into the case because the project illustrates a city-is-for-sale mentality, is illegal under the terms of the Park Act, and bypassed environmental protection laws.

However, the most recent ruling from the Appellate Division may be the end of the lawsuit once and for all, as the Court of Appeals was one of the group’s final avenues for delaying the project, Curbed New York reports.

In a statement, Hudson River Park Trust President & CEO Madelyn Wils referred to the lawsuit as “ill-conceived” while expressing excitement over being able to continue construction on “one of the city’s most spectacular new public spaces.”

 

Rendering courtesy of Heatherwick Studio

 

Rendering courtesy of Heatherwick Studio

Related Stories

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

Urban Planning | Mar 14, 2017

Denmark-based architecture firm gives China the world’s longest elevated bike path

The Xiamen Bicycle Skyway stretches for 7.6 kilometers throughout the central part of the city.

Urban Planning | Feb 9, 2017

Abandoned WWII-era military village to become 'commune for the 21st century'

The village in Heidelberg, Germany, which 16,000 Americans called home at one time, is being redesigned as a commune for up to 4,000 people.

Green | Feb 6, 2017

A to Z: Seoul’s elevated park features 24,000 alphabetized plants

The plants will represent 250 species found in South Korea.

Urban Planning | Jan 17, 2017

Using 'hidden data' to probe urban problems

The Center for Neighborhood Technology has been tackling poverty, housing, transportation, and environmental issues for four decades.

Architects | Nov 11, 2016

Six finalists selected for London’s Illuminated River competition

The competition is searching for the best design for lighting the bridges of central London.

Building Tech | Nov 9, 2016

Dubai to Abu Dhabi in 12 minutes: A hyperloop from Hyperloop One and BIG could make it possible

The pods can reach speeds of up to 1,100 kilometers per hour.

Urban Planning | Nov 4, 2016

Rail Park breaks ground in Philadelphia

The project is finally moving forward after nine years in the making.

Urban Planning | Oct 27, 2016

Paris plans to transform the right bank of the river Seine into car-free pedestrian zone

Drivers are worried the move will cause an increase in traffic congestion.

Urban Planning | Oct 20, 2016

Despite troubled development, Masdar City forges ahead

The detailed master plan for Phase 2 of Masdar City has been unveiled by CBT.

boombox1 - default
boombox2 -
native1 -

More In Category

Urban Planning

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021