flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The Kennedy Center expands for the first time since its 1971 debut

Cultural Facilities

The Kennedy Center expands for the first time since its 1971 debut

The REACH, with three pavilions on a generous lawn, adds openness and light to this performance space.


By John Caulfield, Senior Editor | September 11, 2019
Steven Holl Architects, The Kennedy Center expands for the first time since its 1971 debut

An aerial view of The REACH (left, in front of the Kennedy Center), whose three pavilions are connected underground. Images: Richard Barnes, Courtesy of Steven Holl Architects.

The John F. Kennedy Center for the Performing Arts in Washington D.C. opened its first-ever expansion on September 7, and is celebrating that opening with 16 days of free programming.

Designed by Steven Holl Architects, The REACH, as the addition is known, is anchored by three pavilions—called Welcome, Skylight, and River—located on more than 130,000 sf of sweeping lawn that overlooks the Potomac River. The buildings are linked below ground to create an expanded facility that includes classrooms, three rehearsal studios, and multiuse public spaces.

The project incorporates engineering features that include a void slab design, a technique rarely used in the U.S., which allowed for the expansion’s dramatic sculptural forms and spacious interiors. Plastic balls are embedded in the concrete to reduce the overall deadweight and allow for longer spans. Arup coordinated closely with the design team to ensure that each component of the building’s systems was effectively woven into the slab system on schedule.

 

The Link walkway connects the Kennedy Center's main building to the REACH.

 

To support the architectural vision and ambitious sustainability targets, Arup's team of engineers and consultants collaborated to develop a building systems strategy that optimizes energy performance while remaining largely unseen. For example, an under-floor concrete trench system enables the building services to be distributed out of sightline, thereby preserving the integrity of the architectural vision.

The strategy also incorporates a range of performance-enhancing technologies, from a closed-loop, ground source heat rejection system, to advanced temperature controls and radiant floor heating. Using Arup’s in-house software suite, Oasys Building Environmental Analysis (BEANS), the team demonstrated that the addition of radiant floors would counteract the thermal effects of one of the pavilion’s massive curved wall, providing both heating and cooling and significantly boosting comfort throughout the year while keeping energy demands within acceptable levels.

 

One of three rehearsal studios at The REACH.

 

The REACH could be viewed as a counterpoint to the monolithic Kennedy Center, which one architectural critic once disparaged as a “superbunker” with over-the-top interior design elements and few windows. In contrast, the REACH’s 72,000 sf interior space—which include a living theater, immersive learning center, and public arts incubator—present more-open, inviting spaces to visitors and patrons. The addition increases the Kennedy Center’s public-facing areas by 20%, Deborah Rutter, the Center’s president, told Bizjournals.com.

The Whiting-Turner Contracting Company was the construction manager on the project.

The REACH cost an estimated $175 million, 75% over its original construction buddget, and took two more years than planned to complete. Its supporters say that a portion of the extra cost will pay for operations. The Kennedy Center is in the process of raising $250 million in individual and corporate donations for the new facility, which is targeting LEED Gold certification.

 

The lobby for the Welcome Pavilion, one of three buildings that comprise The REACH.

Related Stories

Cultural Facilities | Nov 17, 2015

MVRDV to turn outdated Taiwanese mall into urban lagoon

The firm's winning design honors Tainan’s natural landscape and historic role as a marine and fishing industry hotspot.

Museums | Nov 11, 2015

MVRDV designs a ‘disco ball’ for Rotterdam

Called the Collectiegebouw (Dutch for "collection building"), the building will make public the city’s extensive art collection, and give visitors a look at how museums work backstage, according to Fast Company.

Cultural Facilities | Oct 28, 2015

New York City’s underground 'Lowline' green space enters the testing phase

If realized, The Lowline would provide 1.5 acres of green space for the Lower East Side of Manhattan.

Sponsored | Cladding and Facade Systems | Oct 27, 2015

The 'new' Gaillard Center gets a standing ovation for its exterior cladding

The “new construction” surrounds three sides of the original building, offering both a classic public structure and exquisite outdoor spaces.

Cultural Facilities | Oct 9, 2015

Sanaa-designed cultural center opens at Connecticut’s Grace Farms

The 83,000-sf The River is five pavillions with space for a sanctuary, library, and gym.

Museums | Sep 29, 2015

Designs unveiled for Warsaw Art Museum and Theatre

Emphasizing the building’s role in the public sphere, the museum will be accessible from all sides.

Cultural Facilities | Sep 24, 2015

Bakpak Architects' 'pottery courtyard' concept in Poland incorporates local heritage

The multifunctional building proposed for Rzeszow, Poland, looks like it was handcrafted on a potter’s wheel.

Museums | Sep 22, 2015

David Adjaye releases plans for Ruby City art gallery in San Antonio

San Antonio's Ruby City will hold 800 works of art in 10,000 sf of exhibition space.

Casinos | Sep 22, 2015

Sovereign territory ruling allows for Mashpee Wampanoag Tribe's $500 million casino

The Massachusetts-based tribe has plans for a 150,000-sf casino and 600-room hotel, along with a waterpark and event center.

Libraries | Aug 27, 2015

Barack Obama Foundation begins search for presidential library architect

Both national and foreign firms will compete for chance to design the Chicago-based Presidential Center.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021