flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

JetBlue opens Gensler-designed International Concourse at JFK

JetBlue opens Gensler-designed International Concourse at JFK

Gensler designed the terminal with a particular focus on passenger well-being. 


By Gensler | November 14, 2014

This morning, JetBlue welcomed the first international arrivals at its new, Gensler-designed International Concourse extension to Terminal 5 (T5) at John F. Kennedy (JFK) International Airport.

The International Concourse will offer customers a modern environment with an emphasis on well-being that simplifies the travel experience. The addition is a seamless extension of Gensler’s award-winning design for T5 (which opened in 2008), and was built in collaboration with Arup, Turner Construction, and The Port Authority of New York and New Jersey.

The 175,000-sf extension includes the conversion of three existing gates to international swing gates, and the addition of three new international swing gates. Further, the International Concourse will include a new security re-check, an immigration hall designed to process 1,400 passengers per hour with the addition of 40 automated passport control kiosks and two new baggage claims.

“Our new International Arrivals Concourse perfectly mirrors T5’s bright and friendly look and feel. Our home terminal, T5, is JetBlue’s unique way to properly welcome people to New York. Thanks to our partners at Gensler, T5i is designed with sustainable considerations including technologies that will help reduce the building’s environmental impact,” said Dave Barger, CEO, JetBlue.

Gensler designed the terminal with a particular focus on passenger well-being. Passengers will have access to views of the city and natural light in unexpected places, including the Primary Hall and corridor through which they must pass upon arriving in the United States. Alighting from this corridor into the Immigration Hall for customs processing, customers will be surprised by 360-degree views to the outside.

A forthcoming outdoor rooftop park, slated to open in spring 2015, will offer all passengers at T5 the ability to stroll outside while enjoying spectacular views of the Manhattan skyline as well as the historic adjacent TWA Terminal.

“We designed the international concourse to welcome people to the US and specifically to New York, greeting them with natural daylight and a view outside. We think travelers awaiting their departing flights will particularly enjoy the ability to take a walk through a rooftop park with great views of the city,” said Gensler Architect and Senior Associate Ty Osbaugh.

 

 

Guided by JetBlue’s mission to bring humanity back to air travel, Gensler’s design includes many customer-friendly design elements for which T5 is known:

  • Sustainable design focused on well-being and improved indoor air quality features water bottle refilling stations throughout the terminal, low-VOC materials, and abundant natural daylight;

  • The modern, timeless, and clean design features splashes of bold color in keeping with the JetBlue brand;

  • Both lounge-like and traditional seating at gates, with access to ample electrical outlets;

  • Features that travelers love in T5 will continue in the new addition: there is free Wi-Fi throughout, customer service zones are located in every concourse and there will be food ordering capability at the gates.

 

 

 

Related Stories

Reconstruction & Renovation | Mar 16, 2017

Pols are ready to spend $1T on rebuilding America’s infrastructure. But who will pick which projects benefit?

The accounting and consulting firm PwC offers the industrial sector a five-step approach to getting more involved in this process.

Airports | Feb 23, 2017

New Orleans Airport to add five additional gates and $110 million to current expansion

The project is being hailed as the city’s most transformative since the construction of the Superdome.

Projects | Jan 25, 2017

Trump prioritizes infrastructure projects, as rebuilding America is now a hot political potato

Both parties are talking about $1 trillion in spending over the next decade. How projects will be funded, though, remains unresolved.

Airports | Jan 17, 2017

JFK Airport set for $10 billion renovation

In addition to the airport itself, the overhaul will also improve road and rail access to meet projected passenger growth.

Airports | Dec 6, 2016

Phoenix Sky Harbor International Airport creates a destination inside Terminal 3

DWL Architects, SmithGroupJJR, and Corgan design passenger experience that connects to the surrounding city and Sonoran desert landscape.

Airports | Nov 1, 2016

FAA forecasts a modest dip in spending for airports over next five years

Latest report based on surveys of 3,340 existing and proposed public-use airports.

Airports | Aug 31, 2016

Aircraft manufacturing facility innovation from The Austin Company

Austin’s many innovations contributed to the success of our clients by enabling them to operate in more efficient environments, optimize the flexibility of their operations, and meet aggressive schedules.

| Jul 29, 2016

AIRPORT FACILITIES GIANTS: Airports binge on construction during busy year for travel

Terminal construction will grow by nearly $1 billion this year, and it will keep increasing. Airports are expanding and modernizing their facilities to keep passengers moving.

Airports | Jun 1, 2016

LaGuardia Airport’s massive redevelopment begins construction

The development consortium has secured financing for the $4 billion project, and signed an operating lease through 2050.

Airports | Apr 6, 2016

HOK leads joint venture to expand and modernize Hartsfield-Jackson Atlanta International Airport’s domestic passenger terminal

The domestic passenger terminal is just the tip of the spear, as the world’s most traveled airport is about to undergo 20 years and $6 billion worth of changes.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021