flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

First newly constructed Signia by Hilton Hotel to be built in Atlanta

Hotel Facilities

First newly constructed Signia by Hilton Hotel to be built in Atlanta

Signia by Hilton is a new upscale brand from Hilton Worldwide Holdings Inc.


By David Malone, Associate Editor | April 21, 2021
Signia by Hilton Hotel exterior in Atlanta

Renderings courtesy Georgia World Congress Center Authority.

The first newly constructed Signia by Hilton Hotel, a new upscale brand from Hilton Worldwide Holdings Inc., is set to be built in Atlanta, Ga. 

The $308 million project will be located on the northwest corner of the Georgia World Congress Center Authority campus and will overlook Mercedes-Benz stadium. It will connect to the Georgia World Congress Center (GWCC) by a walkway.

Signia by Hilton Hotel overlooking Mercedes-Benz stadium

The 1,225,000-sf, 40-story hotel will feature 975 technology-rich guest rooms. Amenities will include 75,000 sf of meeting and event space, parking facilities, a spa, fitness facilities with a 6,670-sf pool deck, an outdoor event lawn and deck, a market, two chef-driven restaurants, and three destination bars. A lobby will welcome guests with locally inspired architecture, landscaping, and a contemporary design aesthetic. 

Skanska and SG Contracting will provide reconstruction and construction management services for the Gensler-designed project. The hotel, which will serve as the headquarters hotel for the GWCC, is slated to open in early 2024.

Related Stories

Market Data | Jan 31, 2017

AIA foresees nonres building spending increasing, but at a slower pace than in 2016

Expects another double-digit growth year for office construction, but a more modest uptick for health-related building.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Hotel Facilities | Dec 5, 2016

Back to sleep: Can hotels help guarantee the full eight hours?

The bed has been both physically and metaphorically pushed to one side in hotel design, in many cases along with the prerequisites of a good night’s sleep.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Hotel Facilities | Sep 19, 2016

The Hotel at Oberlin becomes one of only five hotels to achieve LEED Platinum

The Hotel at Oberlin anchors the Peter B. Lewis Gateway Center, the cornerstone of Oberlin’s Green Arts District.

Hotel Facilities | Aug 17, 2016

First of its kind tri-branded Marriott hotel under construction in downtown Nashville

The hotel will combine the AC Hotels, Residence Inn, and SpringHill Suites brands.

Hotel Facilities | Aug 2, 2016

The dot-com generation: How Millennials are influencing hospitality

Millennials’ desire for authentic experiences has been the catalyst for a refresh of most brand standards, writes Gensler's Lisa Kong

High-rise Construction | Jun 29, 2016

Best Tall Buildings around the world favor unusual shapes and hybrid functions

The Council on Tall Buildings and Urban Habitat selects winners in four regions.

Movers+Shapers | Jun 13, 2016

THE DISRUPTORS: The Millennial generation is imposing its will on design

AEC firms, particularly those that design hotels and offices, gain a competitive edge by knowing how to appeal to the largest share of the American workforce.

Hotel Facilities | May 17, 2016

U.S. hotel construction pipeline full, fueled by upscale property segment

The 506,000 rooms under contract in April represent a 14.6% YoY increase. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021