flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Sponsored Content Roofing

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.


By Duro-Last | May 24, 2017

When one of New England’s premier manufacturing representative agencies purchased a new warehouse, it was clear from the beginning that the building’s existing standing seam roof needed to be replaced before the necessary internal improvements could begin.

The 27,500 square foot building purchased by EDOS Manufacturers’ Reps, Inc. was an existing metal structure with a standing seam metal roof that was severely rusted. The metal pan yielded pull test values of only 180 lbs., which is pushing the lower margin of acceptability by both industry and Duro-Last® engineering standards.

Building owner and President, Robert Os, hired authorized Duro-Last contractor, Breault Roofing of New Bedford, MA, to explore possible solutions. After considering the advantages of each system, Os decided to install the Duro-Last Duro- Bond® Roofing System. This system was viewed as the best option because of key features that set Duro- Last apart from the rest, such as the ability to custom-fabricate the membrane in house; providing edge-to- edge solutions including metals; Duro-Guard® insulation options, and offering a superior warranty.

Thanks to Duro-Last’s custom-fabrication process, the PVC sheets were custom engineered and manufactured to fit this specific project. Being an innovative Duro-Last contractor, Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

“Purlin fastening meant the Duro-Bond plates were in straight lines. This simplified the installation and allowed the crew to work more quickly and efficiently,” said Scott Bieber, Duro-Last Business Development Manager.

 

 

Upon working with Duro-Last customer service and engineering services teams, Duro-Last was able to provide the contractor with the custom-fabricated tabless sheets with the addition of ridge tabs and eave tabs as requested. This resulted in a timely and efficient metal retrofit that used 10,000 less screws than normally required.

Despite taking place in December in Massachusetts, EDOS office manager, Lori Hamelin said, “There were no issues with business operations. Everything went rather smooth and we were able to stay open.” Os added to this by saying that, “The entire project was extremely well done and quick! The people installing it were great and the entire process was seamless.” Both Os and Hamlin also said they are likely to choose a Duro-Last Roofing System again in the future.

To learn more about the Duro-Bond system and other Duro-Last Roofing Systems contact us today at 800-280- 0280 or www.duro-last.com.

Related Stories

Sponsored | Roofing | Oct 24, 2016

Metal roofing panels reinvigorate town staple

Designers for the project initially thought patching and repairs would be sufficient for the 35-year-old, 17,000 square foot roof, however upon further inspection it was determined that the building needed a new roof.

Roofing | Sep 30, 2016

A Florida-based roofing contractor mixes advocacy and philanthropy

The owner of Venture Construction Group says that caring for his father changed his perspective about work and life. 

Sponsored | Coatings | Sep 26, 2016

Valspar products at the forefront of innovation and sustainability

Fluropon SR and Fluropon Pure are two products that help Valspar cultivate a culture of innovation.

Sponsored | Roofing and Fire Safety | Sep 21, 2016

Metal roofing provides exceptional fire resistance

Buildings with great fire resistance will likely have lower insurance costs and be restricted by fewer codes, owing to the decreased risk. 

Sponsored | Energy Efficiency | Jul 27, 2016

Metal Roofs Have Solar Advantage

 A large roof can become a resource that saves significant money on energy consumption and helps reduce emissions of CO2 and it turns out metal roofs make excellent hosts for solar panels.

Sponsored | Roofing | Jun 29, 2016

Retrofit roofs instead of replacement

When faced with the need to replace a flat roof, many building owners find retrofitting a more viable investment, and so they erect a long-lasting, low-maintenance sloped metal roof.

Shopping Centers | Jun 3, 2016

Developer Robinsons Land adds powerful PV arrays to 10 malls in the Philippines

The Robinsons Starmills mall in San Fernando recently turned on a 2.9 megawatt rooftop PV plant.

Codes and Standards | May 19, 2016

Asphalt roofing group publishes updated shingle installation guide

Technical manual provides best practices for roofing professionals.  

Roofing | May 16, 2016

New guide focused on increasing energy and structural performance with raised-heel trusses

Higher trusses simplify attic ventilation, leave more space for insulation.  

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021