flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Sponsored Content Roofing

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.


By Duro-Last | May 24, 2017

When one of New England’s premier manufacturing representative agencies purchased a new warehouse, it was clear from the beginning that the building’s existing standing seam roof needed to be replaced before the necessary internal improvements could begin.

The 27,500 square foot building purchased by EDOS Manufacturers’ Reps, Inc. was an existing metal structure with a standing seam metal roof that was severely rusted. The metal pan yielded pull test values of only 180 lbs., which is pushing the lower margin of acceptability by both industry and Duro-Last® engineering standards.

Building owner and President, Robert Os, hired authorized Duro-Last contractor, Breault Roofing of New Bedford, MA, to explore possible solutions. After considering the advantages of each system, Os decided to install the Duro-Last Duro- Bond® Roofing System. This system was viewed as the best option because of key features that set Duro- Last apart from the rest, such as the ability to custom-fabricate the membrane in house; providing edge-to- edge solutions including metals; Duro-Guard® insulation options, and offering a superior warranty.

Thanks to Duro-Last’s custom-fabrication process, the PVC sheets were custom engineered and manufactured to fit this specific project. Being an innovative Duro-Last contractor, Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

“Purlin fastening meant the Duro-Bond plates were in straight lines. This simplified the installation and allowed the crew to work more quickly and efficiently,” said Scott Bieber, Duro-Last Business Development Manager.

 

 

Upon working with Duro-Last customer service and engineering services teams, Duro-Last was able to provide the contractor with the custom-fabricated tabless sheets with the addition of ridge tabs and eave tabs as requested. This resulted in a timely and efficient metal retrofit that used 10,000 less screws than normally required.

Despite taking place in December in Massachusetts, EDOS office manager, Lori Hamelin said, “There were no issues with business operations. Everything went rather smooth and we were able to stay open.” Os added to this by saying that, “The entire project was extremely well done and quick! The people installing it were great and the entire process was seamless.” Both Os and Hamlin also said they are likely to choose a Duro-Last Roofing System again in the future.

To learn more about the Duro-Bond system and other Duro-Last Roofing Systems contact us today at 800-280- 0280 or www.duro-last.com.

Related Stories

Building Enclosure Systems | Jul 26, 2017

Balcony and roof railings and the code: Maintain, repair, or replace? [AIA course]

Lacking familiarity with current requirements, some owners or managers complete a roof or balcony rehabilitation, only to learn after the fact that they need to tear noncompliant railings out of their new roof or terrace and install new ones. 

Roofing | Jul 17, 2017

EclipseEdge eases installation of raised roof edges, gravel stops, and full coping caps

The EclipseEdge edge metal profile uses a two-part design with a base and a top cover to eliminate steps often required in traditional installations. 

Sponsored | Roofing | Jun 29, 2017

Metal roofs are soaring in popularity in the residential market

The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.

Sponsored | Roofing | Apr 12, 2017

Milwaukee Public Schools adopt innovative roof drainage system from Atlas to extend life of school buildings

Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students.

Roofing | Mar 29, 2017

Product roundup: 12 cutting-edge roofing solutions

Dynatsy Shingles from IKO, CR G cap sheets from Johns Manville, and GenFlex EPDM Adhesive from GenFlex Roofing Systems are three of the 12 products in BD+C's March Product Roundup.

Sponsored | Roofing | Mar 21, 2017

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 

Roofing | Feb 8, 2017

Energy code requirements for commercial low-slope roof assemblies [AIA course]

This course highlights commonly adopted energy-code provisions for commercial low-slope roof assembles and examines the process of how such provisions are adopted.

Sponsored | Roofing | Nov 7, 2016

Pioneering Urban Loft Space in Atlanta

To abide by the historical and city guidelines, Larimer/Shannon Group selected a fully adhered UltraPly™ TPO Roofing System from Firestone Building Products with polyiso insulation, high-density cover boards and an UltraPly TPO Walkway Pad.

Shopping Centers | Nov 4, 2016

Expansion of Chadstone Shopping Centre features 7,000 square meter glass roof

2,700 unique glass panels make up the first roof of its kind in Australia.

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021