flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

7 Cedars Hotel completes on Washington’s Olympic Peninsula

Hotel Facilities

7 Cedars Hotel completes on Washington’s Olympic Peninsula

Rice Fergus Miller Architecture designed the project.


By David Malone, Managing Editor | August 16, 2021
7 Cedars Hotel exterior

Photos courtesy 7 Cedars Hotel

The new 7 Cedars Resort Properties has recently completed construction on Washington’s Olympic Peninsula just adjacent from the S’Klallam Tribe’s 7 Cedars Casino.

The $33 million, 100-room hotel is the first of four phases in Jamestown S’Klallam Tribe’s Master Plan for their resort located in Sequim, Wash. Each floor of the hotel reflects the different “Layers of Life” (sea, shore, land, sky) found near the hotel’s location. One of the hotel’s most noteworthy features is the main level’s facade and entrance, which is clad in Kebony modified wood and carved in tribal designs.

The main floor features the lobby, conference spaces, administrative offices, a reception area with one-of-a-kind custom made kiosks, and a coffee and gift shop. The 100 rooms are divided into four corner suites, eight executive suites, and a mixture of king and double queen rooms. Additionally, the project features a collection of more than 750 art pieces that help tell the story of the tribe and the region.

Rice Fergus Miller Architecture designed the project. Swinerton was the general contractor.

 

7 Cedars Hotel entrance

 

7 Cedars hotel suite

 

7 Cedars Hotel exterior

 

7 Cedars hotel and casino

Related Stories

Market Data | Jan 31, 2017

AIA foresees nonres building spending increasing, but at a slower pace than in 2016

Expects another double-digit growth year for office construction, but a more modest uptick for health-related building.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Hotel Facilities | Dec 5, 2016

Back to sleep: Can hotels help guarantee the full eight hours?

The bed has been both physically and metaphorically pushed to one side in hotel design, in many cases along with the prerequisites of a good night’s sleep.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Hotel Facilities | Sep 19, 2016

The Hotel at Oberlin becomes one of only five hotels to achieve LEED Platinum

The Hotel at Oberlin anchors the Peter B. Lewis Gateway Center, the cornerstone of Oberlin’s Green Arts District.

Hotel Facilities | Aug 17, 2016

First of its kind tri-branded Marriott hotel under construction in downtown Nashville

The hotel will combine the AC Hotels, Residence Inn, and SpringHill Suites brands.

Hotel Facilities | Aug 2, 2016

The dot-com generation: How Millennials are influencing hospitality

Millennials’ desire for authentic experiences has been the catalyst for a refresh of most brand standards, writes Gensler's Lisa Kong

High-rise Construction | Jun 29, 2016

Best Tall Buildings around the world favor unusual shapes and hybrid functions

The Council on Tall Buildings and Urban Habitat selects winners in four regions.

Movers+Shapers | Jun 13, 2016

THE DISRUPTORS: The Millennial generation is imposing its will on design

AEC firms, particularly those that design hotels and offices, gain a competitive edge by knowing how to appeal to the largest share of the American workforce.

Hotel Facilities | May 17, 2016

U.S. hotel construction pipeline full, fueled by upscale property segment

The 506,000 rooms under contract in April represent a 14.6% YoY increase. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021