flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

12 building projects that represent the best in AEC team collaboration

Building Team Awards

12 building projects that represent the best in AEC team collaboration

A busy, light-filled Manhattan subway station and a pebble-shaped Chicago library are among the winners of the 19th annual Building Team Awards. 


By BD+C Editors | May 16, 2016
12 building projects that represent the best in AEC team collaboration

The interior of Fulton Center in Manhattan, N.Y., is constructed of architecturally exposed structural steel, glass storefronts, stainless steel panels, GFRC column covers and ceilings, granite flooring, and a decorative cable net structure in the oculus. Spiral stairs, 15 ADA-compliant elevators, and 10 escalators convey 300,000 passengers a day between nine train lines. A 350-foot tunnel connects to train lines at the World Trade Center.

 

Building Design+Construction's Building Team Awards recognize newly built (opened or occupied January 1, 2015 or later) projects that best exemplify the collaboration between owner, architect, engineer, and contractor to produce buildings that exhibit architectural and construction excellence.

Submissions are judged based on two criteria:

  1. Design/engineering/construction quality and excellence (50%)
  2. How the Building Team (architects, engineers, contractors, CMs, subcontractors, building owners, developers, government entities, etc.) collaborated to overcome obstacles and make the project succeed (50%)

Here are the winners of this year's Building Team Awards, the 19th annual edition.

 

PLATINUM

Onondaga Lakeview Amphitheater. Photo: David Revette/Revette Studio.

1. Onondaga Lakeview Amphitheater

2. Fulton Center

 

GOLD

Chicago Public Library, Chinatown Branch. Photo: Jon Miller/Hedrich Blessing.

1. Chicago Public Library, Chinatown Branch

2. The Tower at PNC Plaza

 

SILVER

CHS Field. Courtesy Snow Kreilich Architects.

1. CHS Field

2. LA MTA Division 13 Bus Operations & Maintenance Facility

 

BRONZE

Ravenswood Family Health Center. Photo: Donald Satterlee/Saterlee Photodesign.

1. Ravenswood Family Health Center

2. 275 Wyman Street

3. New York City Police Training Academy

4. John J. Hemmingson Center, Gonzaga University

 

HONORABLE MENTION

UCSD Medical Center Central Plant. Photo: Kevin Turner.

1. UCSD Medical Center Central Plant

2. 3737 Chestnut

 

Meet the judges

2016 Building Team Awards jury members (left to right): Josh Greenfield, PE, REP, CEM, BEMP, LEED AP; Gary B. Keclik, AIA, CSI, LEED AP, Green Globes Assessor; Beau M. Sanders, PE, SE; Peter Ousley; Jason Chandler, AIA, LEED AP. Not pictured: Bill Kline, AIA, OAA, EDAC, LEED AP, CAA.

 

Jason Chandler, AIA, LEED AP SVP 
Director of Project Management
Epstein, Chicago

Josh Greenfield, PE, REP, CEM, BEMP, LEED AP
VP, Energy Services, Group Manager
Primera Engineers, Chicago

Gary B. Keclik, AIA, CSI, LEED AP 
Green Globes Assessor
Keclik Associates, Hoffman Estates, Ill.

Bill Kline, AIA, OAA, EDAC, LEED AP, CAA
VP, Healthcare Studio Leader 
SmithGroupJJR, Washington, D.C.

Peter Ousley
Project Executive, Public Sector Lead 
Lendlease, Chicago

Beau M. Sanders, PE, SE
Associate, Structural Engineer, Project Manager
Graef, Milwaukee, Wis.

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Building Team Awards | Apr 5, 2015

‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021