flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Wolf Point high-rise development begins construction in Chicago

Wolf Point high-rise development begins construction in Chicago

Pedestrian areas, 100,000 sf of parks, and a river walk will be part of Wolf Point.


By BD+C Staff | July 30, 2014
Designed by Pelli Clarke Pelli Architects, the 48-story luxury residential tower
Designed by Pelli Clarke Pelli Architects, the 48-story luxury residential tower is part of a three-tower mixed-use development

On July 18th, construction began on a 48-story luxury residential tower in Chicago. Part of a larger master plan designed by Pelli Clarke Pelli Architects, the tower is being developed by Hines and Magellan Development Group. All told, three towers will be built as part of the larger project, called Wolf Point.

The three buildings are:

  • West Tower (under construction) - a 50-story, 500-foot-tall apartment building with 500 luxury rental units
  • South Tower - a 950-foot-tall mixed-use building that will be the city's eighth-tallest tower
  • East Tower - a 750-foot-tall mixed-use building.

The development is located at the Y-shaped intersection of the Chicago River's northern, southern, and western branches. As a whole, the project has been contentious for local residents. It was strongly opposed when the developers first introduced it, and the current plan is a revised version of the original. Residents were worried that the original plan would block views of the skyline and increase traffic in the area. 

Pedestrian areas, 100,000 sf of park space, and a river walk will be part of Wolf Point. The developers plan to pursue LEED Silver Certification for the development.

 


A view of Wolf Point from the west. Renderings courtesy of Hines.

 


A view of Wolf Point from the north. Renderings courtesy of Hines.

 


A view of the west garden at Wolf Point. Renderings courtesy of Hines.

Related Stories

| Apr 10, 2012

Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo

Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.

| Apr 6, 2012

Flat tower green building concept the un-skycraper

A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.

| Apr 4, 2012

Bald joins the Harmon glazing team

Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Mar 27, 2012

Bank of America Plaza becomes Atlanta's priciest repo

Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021