flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A welcoming entry-point for wellness screening anywhere

Coronavirus

A welcoming entry-point for wellness screening anywhere

Modular WorkWell™ ecosystem can process up to 40 people per minute.


By John Caulfield, Senior Editor | May 30, 2020

WorkWell is made up up prefabricated components, and the building takes between six and nine weeks to be constructed and operational. Images: Leo A Daly and Turner Construction

During the coronavirus outbreak, wellness often took center stage in discussions about long-term infection control strategies.

Leo A Daly and Turner Construction have partnered on the development of a design-build concept called WorkWell™, an assembly of prefabricated components designed to allow employers, schools, venues, airports and public spaces to efficiently screen large groups of entrants for signs of infectious disease.

The WorkWell™ modular point of entry offers a safe and welcoming setting for health screening of individuals entering high-traffic buildings and public spaces. The centerpiece is the entry pavilion, installed in any area where a controlled checkpoint is needed. Individuals are quickly checked for fever and potentially screened for other health risk factors. The pavilion is designed for touchless operation and includes air handling systems capable of controlling the transfer of airborne pathogens.  

“It’s important for that health screening be a pleasant and welcoming experience,” says Daniel Yudchitz, AIA, Senior Design Architect with Leo A Daly. “We designed WorkWell™ to be an enhancement to a facility, not an ordeal. It should inspire confidence in the health and safety of everyone entering.”

WorkWell's modular design is adjustable for different locations and levels of anticipated screening capacity.

 

PREFABRICATION SPEEDS INSTALLATION PROCESS

WorkWell™ modules are fabricated in an automated shop environment for speed of implementation, product quality and contractor safety. Design-build delivery enables the units to be deployed rapidly at a competitive price point. Offsite fabrication and plug-and-play design require minimal need for onsite construction crews.  

“Prefabrication and modularization allow us to meet aggressive schedules while maintaining a high level of quality control and minimizing the potential for on-site safety incidents,” says Brian Knowles, LEED AP, DBIA, industrial executive at Turner Construction. “By deploying rapidly and at scale, we can keep workforces and the public healthy and facilities safely operational.” 

The marketing campaign for WorkWell launched last Thursday. The product doesn’t have a specific client yet, but the development team is in discussions with several prospects.

The cost of each installation will depend on the application, options chosen, and features chosen. Knowles tells BD+C that, the expected range is from $260,000 to $320,000. “We are looking at six-to-nine weeks for full occupancy from date of confirmed order/scope.”

Related Stories

Coronavirus | Jun 23, 2020

A look back at design standard shifts: ADA vs. COVID-19

The short story is official design guidelines are slow to be developed and made into law. 

Coronavirus | Jun 23, 2020

WATG designs solution for isolating without sacrificing social connectivity

The design was inspired by oriel bay windows.

Coronavirus | Jun 22, 2020

Boldt creates an innovation task force to speed up safe opening of jobsites, 14 offices

Boldt creates an innovation task force to speed up safe opening of jobsites, 14 offices

Coronavirus | Jun 19, 2020

Experts address COVID-19's impact on nursing homes and schools on The Weekly

The June 18 episode of BD+C's "The Weekly" is available for viewing on demand. 

Coronavirus | Jun 18, 2020

Brown University tops off first housing building in three decades

The facility, scheduled for completion next April, will combine a residence hall with student health services.

Coronavirus | Jun 17, 2020

HOK and Germfree partner to design mobile COVID-19 testing lab

Access to quick, reliable, and repeated testing has been one of the greatest challenges for businesses, institutions and individuals during the COVID-19 crisis.

Coronavirus | Jun 17, 2020

Guiding changes in the workplace: Past, present, and future

Since the COVID-19 pandemic, many companies are managing sudden change as they assess the impact on workplace design and how people use spaces.

Coronavirus | Jun 14, 2020

A new report on how campus buildings can reopen safely

Leo A Daly white paper suggests dividing students into smaller “cohorts,” and assigning bathroom spaces.

Coronavirus | Jun 12, 2020

BD+C launches 'The Weekly,' a streaming program for the design and construction industry

The first episode, now available on demand, features experts from Robins & Morton, Gensler, and FMI on the current state of the AEC market.

Coronavirus | Jun 9, 2020

Going viral: How the coronavirus pandemic could change the built environment

Architecture and construction firms—and their clients—are asking new questions about infection control as it pertains to people assembly, building wellness, and technology.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021