flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A welcoming entry-point for wellness screening anywhere

Coronavirus

A welcoming entry-point for wellness screening anywhere

Modular WorkWell™ ecosystem can process up to 40 people per minute.


By John Caulfield, Senior Editor | May 30, 2020

WorkWell is made up up prefabricated components, and the building takes between six and nine weeks to be constructed and operational. Images: Leo A Daly and Turner Construction

During the coronavirus outbreak, wellness often took center stage in discussions about long-term infection control strategies.

Leo A Daly and Turner Construction have partnered on the development of a design-build concept called WorkWell™, an assembly of prefabricated components designed to allow employers, schools, venues, airports and public spaces to efficiently screen large groups of entrants for signs of infectious disease.

The WorkWell™ modular point of entry offers a safe and welcoming setting for health screening of individuals entering high-traffic buildings and public spaces. The centerpiece is the entry pavilion, installed in any area where a controlled checkpoint is needed. Individuals are quickly checked for fever and potentially screened for other health risk factors. The pavilion is designed for touchless operation and includes air handling systems capable of controlling the transfer of airborne pathogens.  

“It’s important for that health screening be a pleasant and welcoming experience,” says Daniel Yudchitz, AIA, Senior Design Architect with Leo A Daly. “We designed WorkWell™ to be an enhancement to a facility, not an ordeal. It should inspire confidence in the health and safety of everyone entering.”

WorkWell's modular design is adjustable for different locations and levels of anticipated screening capacity.

 

PREFABRICATION SPEEDS INSTALLATION PROCESS

WorkWell™ modules are fabricated in an automated shop environment for speed of implementation, product quality and contractor safety. Design-build delivery enables the units to be deployed rapidly at a competitive price point. Offsite fabrication and plug-and-play design require minimal need for onsite construction crews.  

“Prefabrication and modularization allow us to meet aggressive schedules while maintaining a high level of quality control and minimizing the potential for on-site safety incidents,” says Brian Knowles, LEED AP, DBIA, industrial executive at Turner Construction. “By deploying rapidly and at scale, we can keep workforces and the public healthy and facilities safely operational.” 

The marketing campaign for WorkWell launched last Thursday. The product doesn’t have a specific client yet, but the development team is in discussions with several prospects.

The cost of each installation will depend on the application, options chosen, and features chosen. Knowles tells BD+C that, the expected range is from $260,000 to $320,000. “We are looking at six-to-nine weeks for full occupancy from date of confirmed order/scope.”

Related Stories

Coronavirus | Aug 25, 2020

6 must reads for the AEC industry today: August 26, 2020

Big-box retailers’ profits surge, and rent payment tracker finds 90% of apartment households paying rent.

Coronavirus | Aug 25, 2020

7 must reads for the AEC industry today: August 25, 2020

Medical office buildings get a boost by demand and capital, and why the COVID-19 pandemic is increasing the need for telemedicine. 

University Buildings | Aug 20, 2020

Student housing in the COVID-19 era

Student housing remains a vital part of the student and campus experience.

Coronavirus | Aug 17, 2020

Covid-19 and campus life: Where do we go from here?

Campus communities include international, intergenerational, and varied health-risk populations.

Coronavirus | Aug 10, 2020

Reimagining multifamily spaces in the COVID era

Multifamily developments pose unique challenges and opportunities.

Coronavirus | Aug 3, 2020

Exploring the airborne transmission of the coronavirus and strategies for mitigating risk

Health authorities say it’s important to understand the dangers of microdroplets. How might indoor ventilation need to change?

Coronavirus | Jul 31, 2020

The Weekly show: Microhospitals, mass timber, and the outlook for 5 key building sectors

The July 30 episode of BD+C's "The Weekly" is available for viewing on demand. 

University Buildings | Jul 24, 2020

A hybrid learning approach could redefine higher education

Universities reassess current assets to determine growth strategies.

Coronavirus | Jul 20, 2020

Student housing amid the pandemic, infection control in buildings, and future airport design on "The Weekly"

Experts from Core Spaces, Bala Consulting Engineers, and Populous were interviewed in the July 23 streaming program from Horizon TV.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021