flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Museums

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Designed by SmithGroupJJR, the David and Fela Shapell Family Collections and Conservation Center will provide long-term, secure preservation for evidence of the Holocaust.


By SmithGroupJJR | November 10, 2015
U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

The David and Fela Shapell Family Collections and Conservation Center will open in early 2017. Rendering courtesy SmithGroupJJR

The United States Holocaust Memorial Museum’s new David and Fela Shapell Family Collections and Conservation Center has broken ground at an undisclosed location. The 100,000-sf building is designed by SmithGroupJJR.

The new Shapell Center will provide the archival-quality environments to support the preservation of artifacts documenting the Holocaust, ensuring that the evidence of the genocide will not be lost to future generations. With planned expansion space, the Shapell Center will provide a home for the growing collection.

The facility is designed to balance collections and non-collections. The building is organized in two halves: a “clean” side accommodates collections-related activities that includes a reading room; artifact storage; conservations labs for the treatment objects, textiles, paper and photographs; and a collections processing suite with a photo studio for digitizing the collection. A “dirty” side provides standard conditioning for non-collections storage; isolated wood, metal and paint shops for exhibit design and production; and staff office space.

Construction of the Shapell Center is expected to be completed in early 2017. SmithGroupJJR’s design services include architecture, MEP engineering, lighting design, landscape architecture and interior design. SmithGroupJJR leads the broader design team which includes Weidlinger Associates, Inc., The Sextant Group, Inc. and Rummel Klepper & Kahl. DPR Construction is serving as the construction manager.

Tags

Related Stories

Museums | Dec 15, 2016

The design of the Shanghai Planetarium draws inspiration from astronomical principles

Housed within the 400,000-sf building will be the world’s largest planetarium theater.

Museums | Dec 15, 2016

The Grand Louvre - Phase I honored with AIA Twenty-five Year Award

The award recognizes an architectural design that has stood the test of time for 25 years.

Sponsored | Museums | Dec 1, 2016

Monumental museum features Fluropon to highlight heritage and high-esteem

The building is an important landmark for the nation, and is built on the last available spot on the National Mall in Washington D.C. 

Museums | Nov 18, 2016

Plans for the expansion and renovation of the Asian Art Museum in Seattle unveiled

LMN Architects is the architect and interior designer for the Bebb and Gould-designed museum.

Museums | Nov 17, 2016

The Guggenheim Helsinki has one final chance to become a reality

The museum’s fate will be decided with a final vote on a new proposal.

Museums | Nov 8, 2016

Museum of the Bible to use technology to bring the Bible to life

The museum will be two blocks from the National Mall and three blocks from the Capitol.

Museums | Oct 10, 2016

New, larger Statue of Liberty Museum being built on Liberty Island

The museum will look to complement the Statue of Liberty without drawing attention away from it

Museums | Sep 21, 2016

Design guidelines for museums, archives, and art storage facilities

Specialty Buildings Column Series, Part 2 of 6 [Click Here to Part 1]

Museums | Sep 19, 2016

Museums refine their mission in the digital age

Preserving history is still their core function, but museums are using fresh approaches to engage an easily distracted public.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021