flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

Sports and Recreational Facilities

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

The 70,000-seat stadium will be ready by the 2019 NFL season. The surrounding mixed-use development includes space for retail, hotels, and public parks.


By Mike Chamernik, Associate Editor | July 18, 2016

The new stadium and mixed-use project for the Los Angeles Rams. Renderings courtesy LA Rams.

Turner Construction and AECOM have been selected by Hollywood Park Land Company to build the new stadium and mixed-use project for the Los Angeles Rams in Inglewood, Calif.

Designed by HKS Architects, the Rams’ new 70,000-seat home is slated to have 275 luxury suites and 16,000 premium seats. It will also have room for 27,000 standing spectators and three million sf of usable space. 

The surrounding Hollywood Park entertainment district will truly be considered mixed-use. It will be designed to have a 6,000-seat performance center; 890,000 sf of retail space; 780,000 sf of office space; 300 hotel rooms; 2,500 residential units; and 25 acres of parks and playgrounds. The entire project will sit on a 298-acre site and could cost upwards of $3 billion. 

 

 

Turner, one of the nation's largest construction management companies, and AECOM, a multinational engineering firm, are both Giants in the sports AEC world. Between them, they have built 17 NFL stadiums and renovated 10 others. Turner was involved with the construction of the San Francisco 49ers’ Levi’s Stadium and the renovations to Lambeau Field, the home of the Green Bay Packers. AECOM was part of the teams that built the Seattle Seahawks’ CenturyLink Field and that led the renovations to the New Orleans Saints’ Mercedes-Benz Superdome. Most recently, Turner was the GC and AECOM was the architect of the Golden 1 Center, the Sacramento Kings’ new basketball arena that will open this fall.

“After a competitive review of a number of outstanding construction firms, we have hired the best team to build the largest and most technologically advanced sports stadium in the world for the Los Angeles Rams,” Terry Fancher, president of the Hollywood Park Land Co., said in a statement.

Turner and AECOM will join a Building Team already consisting of HKS, Legends Project Development (project management services) and Wilson Meany of San Francisco (entitlement and infrastructure management).

The Rams’ stadium is expected to open in time for the 2019 NFL season. In the meantime, the team will play at the 93-year-old, 90,000-seat L.A. Coliseum. 

The upcoming season will be the first year back on the West Coast for the Rams. They played in Los Angeles from 1946 to 1994, and were based in St. Louis from 1995 through last season. Stan Kroenke, the owner of the entities that control both the Rams and the Hollywood Park Land Company, engineered the move to LA over the last few years, starting with the purchase of the 60 acres of land in Inglewood back in 2014.

Two other NFL teams, the San Diego Chargers and the Oakland Raiders, both could still move to Los Angeles and share the new stadium with the Rams. The Chargers are working out a new stadium deal with their city, and the Raiders are considering plans for both Oakland and Las Vegas.

Related Stories

| Aug 11, 2010

Dream Fields, Lone Star Style

How important are athletic programs to U.S. school districts? Here's one leading indicator: In 2005, the National Football League sold 17 million tickets. That same year, America's high schools sold an estimated 225 million tickets to football games, according to the American Football Coaches Association.

| Aug 11, 2010

Giants 300 University Report

University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

Financial Wizardry Builds a Community

At 69 square miles, Vineland is New Jersey's largest city, at least in geographic area, and it has a rich history. It was established in 1861 as a planned community (well before there were such things) by the utopian Charles Landis. It was in Vineland that Dr. Thomas Welch found a way to preserve grape juice without fermenting it, creating a wine substitute for church use (the town was dry).

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Bronze Award: Alumni Gymnasium Renovation, Dartmouth College Hanover, N.H.

At a time when institutions of higher learning are spending tens of millions of dollars erecting massive, cutting-edge recreation and fitness centers, Dartmouth College in Hanover, N.H., decided to take a more modest, historical approach. Instead of building an ultra-grand new facility, the university chose to breathe new life into its landmark Alumni Gymnasium by transforming the outdated 99-y...

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021