Turner Construction and AECOM have been selected by Hollywood Park Land Company to build the new stadium and mixed-use project for the Los Angeles Rams in Inglewood, Calif.
Designed by HKS Architects, the Rams’ new 70,000-seat home is slated to have 275 luxury suites and 16,000 premium seats. It will also have room for 27,000 standing spectators and three million sf of usable space.
The surrounding Hollywood Park entertainment district will truly be considered mixed-use. It will be designed to have a 6,000-seat performance center; 890,000 sf of retail space; 780,000 sf of office space; 300 hotel rooms; 2,500 residential units; and 25 acres of parks and playgrounds. The entire project will sit on a 298-acre site and could cost upwards of $3 billion.
Turner, one of the nation's largest construction management companies, and AECOM, a multinational engineering firm, are both Giants in the sports AEC world. Between them, they have built 17 NFL stadiums and renovated 10 others. Turner was involved with the construction of the San Francisco 49ers’ Levi’s Stadium and the renovations to Lambeau Field, the home of the Green Bay Packers. AECOM was part of the teams that built the Seattle Seahawks’ CenturyLink Field and that led the renovations to the New Orleans Saints’ Mercedes-Benz Superdome. Most recently, Turner was the GC and AECOM was the architect of the Golden 1 Center, the Sacramento Kings’ new basketball arena that will open this fall.
“After a competitive review of a number of outstanding construction firms, we have hired the best team to build the largest and most technologically advanced sports stadium in the world for the Los Angeles Rams,” Terry Fancher, president of the Hollywood Park Land Co., said in a statement.
Turner and AECOM will join a Building Team already consisting of HKS, Legends Project Development (project management services) and Wilson Meany of San Francisco (entitlement and infrastructure management).
The Rams’ stadium is expected to open in time for the 2019 NFL season. In the meantime, the team will play at the 93-year-old, 90,000-seat L.A. Coliseum.
The upcoming season will be the first year back on the West Coast for the Rams. They played in Los Angeles from 1946 to 1994, and were based in St. Louis from 1995 through last season. Stan Kroenke, the owner of the entities that control both the Rams and the Hollywood Park Land Company, engineered the move to LA over the last few years, starting with the purchase of the 60 acres of land in Inglewood back in 2014.
Two other NFL teams, the San Diego Chargers and the Oakland Raiders, both could still move to Los Angeles and share the new stadium with the Rams. The Chargers are working out a new stadium deal with their city, and the Raiders are considering plans for both Oakland and Las Vegas.
Related Stories
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 24, 2012
Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence
Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.