flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

Sports and Recreational Facilities

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

The 70,000-seat stadium will be ready by the 2019 NFL season. The surrounding mixed-use development includes space for retail, hotels, and public parks.


By Mike Chamernik, Associate Editor | July 18, 2016

The new stadium and mixed-use project for the Los Angeles Rams. Renderings courtesy LA Rams.

Turner Construction and AECOM have been selected by Hollywood Park Land Company to build the new stadium and mixed-use project for the Los Angeles Rams in Inglewood, Calif.

Designed by HKS Architects, the Rams’ new 70,000-seat home is slated to have 275 luxury suites and 16,000 premium seats. It will also have room for 27,000 standing spectators and three million sf of usable space. 

The surrounding Hollywood Park entertainment district will truly be considered mixed-use. It will be designed to have a 6,000-seat performance center; 890,000 sf of retail space; 780,000 sf of office space; 300 hotel rooms; 2,500 residential units; and 25 acres of parks and playgrounds. The entire project will sit on a 298-acre site and could cost upwards of $3 billion. 

 

 

Turner, one of the nation's largest construction management companies, and AECOM, a multinational engineering firm, are both Giants in the sports AEC world. Between them, they have built 17 NFL stadiums and renovated 10 others. Turner was involved with the construction of the San Francisco 49ers’ Levi’s Stadium and the renovations to Lambeau Field, the home of the Green Bay Packers. AECOM was part of the teams that built the Seattle Seahawks’ CenturyLink Field and that led the renovations to the New Orleans Saints’ Mercedes-Benz Superdome. Most recently, Turner was the GC and AECOM was the architect of the Golden 1 Center, the Sacramento Kings’ new basketball arena that will open this fall.

“After a competitive review of a number of outstanding construction firms, we have hired the best team to build the largest and most technologically advanced sports stadium in the world for the Los Angeles Rams,” Terry Fancher, president of the Hollywood Park Land Co., said in a statement.

Turner and AECOM will join a Building Team already consisting of HKS, Legends Project Development (project management services) and Wilson Meany of San Francisco (entitlement and infrastructure management).

The Rams’ stadium is expected to open in time for the 2019 NFL season. In the meantime, the team will play at the 93-year-old, 90,000-seat L.A. Coliseum. 

The upcoming season will be the first year back on the West Coast for the Rams. They played in Los Angeles from 1946 to 1994, and were based in St. Louis from 1995 through last season. Stan Kroenke, the owner of the entities that control both the Rams and the Hollywood Park Land Company, engineered the move to LA over the last few years, starting with the purchase of the 60 acres of land in Inglewood back in 2014.

Two other NFL teams, the San Diego Chargers and the Oakland Raiders, both could still move to Los Angeles and share the new stadium with the Rams. The Chargers are working out a new stadium deal with their city, and the Raiders are considering plans for both Oakland and Las Vegas.

Related Stories

| Mar 25, 2011

Qatar World Cup may feature carbon-fiber ‘clouds’

Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.

| Mar 11, 2011

University of Oregon scores with new $227 million basketball arena

The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.

| Mar 11, 2011

Community sports center in Nashville features NCAA-grade training facility

A multisport community facility in Nashville featuring a training facility that will meet NCAA Division I standards is being constructed by St. Louis-based Clayco and Chicago-based Pinnacle.

| Mar 11, 2011

Slam dunk for the University of Nebraska’s basketball arena

The University of Nebraska men’s and women’s basketball programs will have a new home beginning in 2013. Designed by the DLR Group, the $344 million West Haymarket Civic Arena in Lincoln, Neb., will have 16,000 seats, suites, club amenities, loge, dedicated locker rooms, training rooms, and support space for game operations.

| Feb 23, 2011

London 2012: What Olympic Park looks like today

London 2012 released a series of aerial images that show progress at Olympic Park, including a completed roof on the stadium (where seats are already installed), tile work at the aquatic centre, and structural work complete on more than a quarter of residential projects at Olympic Village.

| Jan 21, 2011

Sustainable history center exhibits Fort Ticonderoga’s storied past

Fort Ticonderoga, in Ticonderoga, N.Y., along Lake Champlain, dates to 1755 and was the site of battles in the French and Indian War and the American Revolution. The new $20.8 million, 15,000-sf Deborah Clarke Mars Education Center pays homage to the French magasin du Roi (the King’s warehouse) at the fort.

| Jan 20, 2011

Houston Dynamo soccer team plans new venue

Construction is scheduled to begin this month on a new 22,000-seat Major League Soccer stadium for the Houston Dynamo. The $60 million project is expected to be ready for the 2012 MLS season.

| Jan 20, 2011

Construction begins on second St. Louis community center

O’Fallon Park Recreation Complex in St. Louis, designed by local architecture/engineering firm KAI Design & Build, will feature an indoor aquatic park with interactive water play features, a lazy river, water slides, laps lanes, and an outdoor spray and multiuse pool.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021