flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

Sports and Recreational Facilities

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

The 70,000-seat stadium will be ready by the 2019 NFL season. The surrounding mixed-use development includes space for retail, hotels, and public parks.


By Mike Chamernik, Associate Editor | July 18, 2016

The new stadium and mixed-use project for the Los Angeles Rams. Renderings courtesy LA Rams.

Turner Construction and AECOM have been selected by Hollywood Park Land Company to build the new stadium and mixed-use project for the Los Angeles Rams in Inglewood, Calif.

Designed by HKS Architects, the Rams’ new 70,000-seat home is slated to have 275 luxury suites and 16,000 premium seats. It will also have room for 27,000 standing spectators and three million sf of usable space. 

The surrounding Hollywood Park entertainment district will truly be considered mixed-use. It will be designed to have a 6,000-seat performance center; 890,000 sf of retail space; 780,000 sf of office space; 300 hotel rooms; 2,500 residential units; and 25 acres of parks and playgrounds. The entire project will sit on a 298-acre site and could cost upwards of $3 billion. 

 

 

Turner, one of the nation's largest construction management companies, and AECOM, a multinational engineering firm, are both Giants in the sports AEC world. Between them, they have built 17 NFL stadiums and renovated 10 others. Turner was involved with the construction of the San Francisco 49ers’ Levi’s Stadium and the renovations to Lambeau Field, the home of the Green Bay Packers. AECOM was part of the teams that built the Seattle Seahawks’ CenturyLink Field and that led the renovations to the New Orleans Saints’ Mercedes-Benz Superdome. Most recently, Turner was the GC and AECOM was the architect of the Golden 1 Center, the Sacramento Kings’ new basketball arena that will open this fall.

“After a competitive review of a number of outstanding construction firms, we have hired the best team to build the largest and most technologically advanced sports stadium in the world for the Los Angeles Rams,” Terry Fancher, president of the Hollywood Park Land Co., said in a statement.

Turner and AECOM will join a Building Team already consisting of HKS, Legends Project Development (project management services) and Wilson Meany of San Francisco (entitlement and infrastructure management).

The Rams’ stadium is expected to open in time for the 2019 NFL season. In the meantime, the team will play at the 93-year-old, 90,000-seat L.A. Coliseum. 

The upcoming season will be the first year back on the West Coast for the Rams. They played in Los Angeles from 1946 to 1994, and were based in St. Louis from 1995 through last season. Stan Kroenke, the owner of the entities that control both the Rams and the Hollywood Park Land Company, engineered the move to LA over the last few years, starting with the purchase of the 60 acres of land in Inglewood back in 2014.

Two other NFL teams, the San Diego Chargers and the Oakland Raiders, both could still move to Los Angeles and share the new stadium with the Rams. The Chargers are working out a new stadium deal with their city, and the Raiders are considering plans for both Oakland and Las Vegas.

Related Stories

| Aug 11, 2010

Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics

Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report

A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gensler among eight teams named finalists in 'classroom of the future' design competition

Eight teams were recognized today as finalists of the 2009 Open Architecture Challenge: Classroom. Finalists submitted designs ranging from an outdoor classroom for children in inner-city Chicago, learning spaces for the children of salt pan workers in India, safe spaces for youth in Bogota, Colombia and a bamboo classroom in the Himalayan mountains.

| Aug 11, 2010

ASHRAE introduces building energy label prototype

Most of us know the fuel efficiency of our cars, but what about our buildings? ASHRAE is working to change that, moving one step closer today to introducing its building energy labeling program with release of a prototype label at its 2009 Annual Conference in Louisville, Ky.

| Aug 11, 2010

10 tips for mitigating influenza in buildings

Adopting simple, common-sense measures and proper maintenance protocols can help mitigate the spread of influenza in buildings. In addition, there are system upgrades that can be performed to further mitigate risks. Trane Commercial Systems offers 10 tips to consider during the cold and flu season.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021