A new hospital in Ontario will nearly triple the care capacity of its existing facility—becoming the largest hospital in Canada.
In Mississauga, a suburb of Toronto, hospital system Trillium Health Partners (THP) will fully replace its Mississauga Hospital with a new facility that will increase the number of operating rooms from 14 to 23 and include more than 950 beds. At approximately 2.8 million square feet and 24 floors, the new Mississauga Hospital will feature modern hospital facilities and technology and reflect the latest standards in infection prevention and control.
THP’s emergency department, one of the busiest in Canada, will significantly expand to improve patient experience and reduce wait times. The hospital will house advanced diagnostic imaging facilities and a new pharmacy and clinical laboratory. And it will continue to deliver specialized care through regional programs, such as the regional center for advanced cardiac surgery and neurosurgery services, among others.
With design and engineering services by global integrated design firm Stantec, the new Mississauga Hospital will be a critical part of THP’s plan to provide healthcare that serves the growing community for decades to come.
“Critical health infrastructure, like Trillium Health Partners’ Mississauga site, are essential to advance quality healthcare in Ontario and keep our diverse communities healthy,” Suzanne Crysdale, Stantec principal, says in a statement.
Mississauga Hospital marks the second Stantec project for THP. In December, Stantec announced it will provide design and engineering services for a nine-floor, 600,000-square-foot patient tower with over 350 beds.
In recent years, Stantec has designed several major healthcare projects in Ontario, including Cortellucci Vaughan Hospital’s 1.2 million-square-foot facility; Cambridge Memorial Hospital’s patient care wing; Brockville General Hospital’s complex for continuing care, mental health, and rehabilitation; and Centre for Addiction and Mental Health’s redevelopment project.
Related Stories
| Jun 11, 2014
David Adjaye’s housing project in Sugar Hill nears completion
A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.
| Apr 8, 2014
Fire resistive curtain wall helps The Kensington meet property line requirements
The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.
| Mar 25, 2014
Sydney breaks ground on its version of the High Line elevated park [slideshow]
The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.
| Jan 28, 2014
2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs
Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry.
| Jan 21, 2014
2013: The year of the super-tall skyscraper
Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.
| Sep 23, 2013
Six-acre Essex Crossing development set to transform vacant New York property
A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.
| Apr 22, 2013
Top 10 green building projects for 2013 [slideshow]
The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.
| Feb 28, 2013
Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ
Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.
| Feb 27, 2013
Bronx residents get LEED Platinum public housing complex, rooftop farm
The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.