flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Success through teamwork for landmark California project

Sponsored Content Transit Facilities

Success through teamwork for landmark California project

The LEED Platinum-certified building provides service annually for 43 million passengers


By Viega | June 15, 2015
Anaheim Regional Transportation Intermodal Center

Anaheim Regional Transportation Intermodal Center

The Anaheim Regional Transportation Intermodal Center (ARTIC) is the Grand Central Station of the future. Centrally located in Orange County, California, ARTIC provides transportation service for three million local residents as well as 40 million annual visitors.

A LEED Platinum-certified building, the structure is 67,000 square feet with three levels, connecting people to a variety of transit options as well as entertainment, dining and retail locations.

“The ARTIC station is pretty monumental for the future,” said Paul Redgate, Pipe Fitting Superintendent for California Comfort Systems in San Diego. “It has multiple resources—a bus station, large parking facility for car pools. It’s the first of the high-speed rail stations that has been built today. The project itself was high profile for the city of Anaheim, much different than a typical install.”

ARTIC’s unique architecture includes a large number of windows and a dome-shaped structure, which results in high solar gains. Due to ARTIC’s unique architecture and size, controlling the climate inside the building with a conventional forced-air system would have been nearly impossible. Instead, HVAC designers for the project chose to implement a radiant heating and cooling system. Radiant cooling allows instantaneous removal of heat through absorption. Installing ViegaPEX™ Barrier tubing at tightly spaced increments (6 inches on-center) allows it to be within two inches of the finished surface floor, which gave the engineer the ability to immediately remove the solar sensible gain. For the ARTIC project, the cooling capacity ranges up to 40 btuh/sq. ft. This provides an energy savings of 34 percent over ASHRAE 90.1-2007.

“We installed 44,000 feet of in-slab heating and cooling pipe, 18 manifolds and 12 pumps,” Redgate said. “It was pretty large. This was our first radiant project of this size. We’ve done some smaller stuff but nothing on this scale.”

The ARTIC project marked California Comfort Systems’ first radiant heating and cooling project with Viega systems. It was also the first time the company worked hand-in-hand with Viega for the design of a project.

“From start to finish, from inception of the design to the commissioning, Viega was there by our side,” Redgate said. “Viega’s involvement was priceless; they didn’t just hand us the package and walk away. To have them out there all the way through to the end of the project was probably the best overall. And we still beat the industry average by 25 percent on the install.”

Viega offers radiant heating and cooling solutions that are easy to install. With simple connections and engineered system designs, Viega makes radiant heating and cooling projects easy, regardless of the project size. For more complicated, large-scale projects where the installers may not be totally confident, Viega offers training and assistance from start to finish.

“I can’t express enough how impressed I was with these guys who were paying attention to our project,” Redgate said. “Viega has a great team of people that are very passionate about their product.”

For more information, visit www.viega.us.

Related Stories

Big Data | May 5, 2016

The Center for Neighborhood Technology has launched the largest source of transit data in the country

AllTransit analyzes the social benefits of good transit service by analyzing data related to health, equity, and economic development.

Giants 400 | Jan 29, 2016

TRANSIT SECTOR GIANTS: Perkins+Will, Skanska among top transit/TOD facility AEC firms

BD+C's rankings of the nation's largest transit/TOD sector design and construction firms, as reported in the 2015 Giants 300 Report 

Transit Facilities | Jan 18, 2016

Pennsylvania Station set to transform into a world-class transportation hub

Governor Andrew Cuomo presented plans to turn Pennsylvania Station and the neighboring James A. Farley Post Office into a free flowing 21st century work of art.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Transit Facilities | Sep 15, 2015

Grimshaw and Arup unveil proposal for London high-speed train station

Renderings that have been released show a glazed façade and a new entrance that will create a “light and airy destination with shops, restaurants, and cafes.”

Transit Facilities | Sep 10, 2015

New London Underground plan from NBBJ consists of moving walkway

For once, walking can be faster than taking a train.

Transit Facilities | Jul 30, 2015

Snøhetta designs ring-shaped cable car station in Italian Alps

In Snøhetta’s design, two cylindrical rings embedded into the existing topography, each at different elevations, will be connected by a cable car. During the minute-long cable car journey, passengers can enjoy views of the city and of the Italian Alps.

Transit Facilities | Jun 9, 2015

BIG releases golden-roof plan for transport hub in Swedish city

“Like a continuous thin sheet, the roof is gently lifted at its four corners, wrapping the city's vehicular infrastructure in multiple layers of public program and urban spaces,” said Ingels.

Glass and Glazing | Jun 4, 2015

Construction of record breaking glass-bottom bridge nearly complete in China

Designed by Israeli architect Haim Dotan, the white bridge is meant to look as if it is “disappearing into the clouds.”

Fire and Life Safety | May 27, 2015

7 bold applications and innovations for fire and life safety

BD+C’s roundup features colorful sprinklers for offices, hotels, museums; a fire-rated curtain wall at a transit hub in Manhattan; a combination CO/smoke detector; and more.

boombox1 - default
boombox2 -
native1 -

More In Category

Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021