flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

SAFTI FIRST hosts architectural summit in New York

SAFTI FIRST hosts architectural summit in New York


May 25, 2011

SAN FRANCISCO (May 24, 2011) – SAFTI FIRST, a manufacturer of fire rated glazing and framing systems, is hosting the Architectural Summit on Thursday, June 2 at the W Hotel in New York City (541 Lexington Avenue).  The Architectural Glazing Summit is a half-day educational conference where architects, specifiers and contract glaziers can learn about the latest advances in glazing technology and design.  SAFTI FIRST, Wausau Window and Wall Systems, W&W Glass, LLC and Firestone/UNA-CLAD will each be presenting an AIA registered program at this event, giving attendees the opportunity to earn multiple AIA/CES LUs, HSW and SD credits across a broad range of topics.  There is no cost to attend this premiere educational event.  Topics include:

  • Code Considerations in Fire Rated Glass by SAFTI FIRST (1 AIA LU/HSW)
  • Innovations in Structural Glazing by W&W Glass, LLC (1 AIA LU)
  • Window Selection and Sustainability for Long Term Performance by Wausau Window and Wall Systems (1 AIA LU/HSW/SD)
  • Designing Metal Panel Systems by Firestone/UNA-CLAD  (1 AIA LU/HSW)

This is the second time that SAFTI FIRST is hosting this event, following the successful turnout in San Francisco last October 2010.  “Educating the architectural community on the latest innovations and code requirements has always been a priority for SAFTI FIRST,” says Diana San Diego, Director of Marketing.  “We are very fortunate to have Wausau, W&W and Firestone share in that goal, and we are grateful for the additional support from Schott.” 

A list of presentation topics and presenter bios can be found here.

For more information, please visit www.safti.com.

About SAFTI FIRST

Founded in 1982, SAFTI FIRST Fire Rated Glazing Solutions has been serving the architectural and building communities and is the recognized leader in manufacturing fire rated glass and framing for over 25 years.  As the premier source for fire-rated glazing, SAFTI FIRST was the first to introduce transparent fire rated walls to the U.S. market. Our SuperLite™ product line, fire rated from 20 minutes to three hours, includes fire-retardant filled glass units, safety ceramics, safety wired glass and SuperLite I-XL, a patented breakthrough fire protective  product that significantly reduces radiant heat transfer (does not meet ASTM E119 and requires AHJ approval for 45 and 60 minute applications).  SuperLite products can be customized to protect against noise, attack, impact, bullets, blast, hurricane and UV rays and is available in any custom architectural make-up, including enhanced energy performance applications.  SAFTIfire GPX Framing is fire rated from 20 minutes to 2 hours.  Our products are manufactured in the U.S. for fast lead times.

Related Stories

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Oct 24, 2011

Kolbe adds 3-D models of direct set windows to BIM library?

Beveled Direct Set SketchUp and Revit Models available.

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021