flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: Lovejoy Wharf

Reconstruction Awards

Reconstruction Awards: Lovejoy Wharf

After demolishing the rotten wood wharf, Suffolk Construction (GC) built a new 30,000-sf landscaped quay, now known as Lovejoy Wharf.


By BD+C Staff | November 15, 2016

Developer Related Beal landed Converse as the sole tenant for the Hoffman Building. The adaptive reuse secured LEED Gold certification and $9.9 million in tax relief over a 25-year period. © Gustav Hoiland / Flagship Photo.

The Architectural Team (designer) led the conversion of Boston’s Hoffman Building, a 1906 confectionary manufacturing facility (later a submarine battery plant), and a dilapidated wharf into a mixed-use office/retail complex for client Related Beal.

The team had to comply with Boston’s Article 80 Large Project Review, master plan requirements set by the Boston Redevelopment Authority, and the city’s long-standing goal of created a continuous Harborwalk along the water’s edge.

After demolishing the rotten wood wharf, Suffolk Construction (GC) built a new 30,000-sf landscaped quay, now known as Lovejoy Wharf. It is home to a two-story music studio, a public entertainment venue, and 7,000 sf of retail. The Hoffman Building is now the world headquarters of Converse Inc., the retro sneaker maker.

It took a year to dry out and waterproof the basement of the Hoffman Building.

The top two floors were found to be structurally unsound; they were replaced with a brick-clad story and two floors in glass and structural steel. Wood reclaimed from the old wharf, polished concrete floors, and exposed columns added to the “industrial heritage” of the finished structure. 

 

PROJECT SUMMARY 

 

Silver Award Winner | Boston, Mass.

Building Team: The Architectural Team (submitting firm, architect); Related Beal (owner); Jennifer Carpenter Architect (interior architect); McNamara Salvia (SE); AHA Consulting Engineer (MEP); and Suffolk Construction (GC/CM).

Details: 220,000 sf. Construction cost: Confidential. Construction time: December 2012 to April 2015. Delivery method: Design-bid-build.

Related Stories

Reconstruction Awards | Nov 11, 2016

Exclusive Chicago club re-emerges as a boutique hotel

Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.

Reconstruction Awards | Dec 1, 2015

Massive Chicago parking garage gets overdue waterproofing

Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.

Reconstruction Awards | Nov 30, 2015

Washington Monument restored after 2011 East Coast earthquake

This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.

Reconstruction Awards | Nov 30, 2015

Denver's 107-year-old seminary campus modernized

The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.

Reconstruction Awards | Nov 24, 2015

Center of I.M. Pei-designed plaza part of Washington redevelopment

The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.

Reconstruction Awards | Nov 24, 2015

Manhattan's first freestanding emergency department a result of adaptive reuse

The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.

Reconstruction Awards | Nov 19, 2015

Nave restored at Yale’s Sterling Memorial Library

Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.

Reconstruction Awards | Nov 19, 2015

Infinite Chicago redevelopment bridges past to present

The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.

Reconstruction Awards | Nov 18, 2015

Sun Theater serves the youth of St. Louis

Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.  

Reconstruction Awards | Nov 17, 2015

Smithsonian Institution’s Arts and Industries Building again an exposition and museum space

After removing decades’ worth of unfortunate additions to expose 17 historic interior spaces for the National Historic Landmark, the Building Team zoned in on the client’s key concern.  

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021