After demolishing the rotten wood wharf, Suffolk Construction (GC) built a new 30,000-sf landscaped quay, now known as Lovejoy Wharf.


By BD+C Staff | November 15, 2016

Developer Related Beal landed Converse as the sole tenant for the Hoffman Building. The adaptive reuse secured LEED Gold certification and $9.9 million in tax relief over a 25-year period. © Gustav Hoiland / Flagship Photo.

The Architectural Team (designer) led the conversion of Boston’s Hoffman Building, a 1906 confectionary manufacturing facility (later a submarine battery plant), and a dilapidated wharf into a mixed-use office/retail complex for client Related Beal.

The team had to comply with Boston’s Article 80 Large Project Review, master plan requirements set by the Boston Redevelopment Authority, and the city’s long-standing goal of created a continuous Harborwalk along the water’s edge.

After demolishing the rotten wood wharf, Suffolk Construction (GC) built a new 30,000-sf landscaped quay, now known as Lovejoy Wharf. It is home to a two-story music studio, a public entertainment venue, and 7,000 sf of retail. The Hoffman Building is now the world headquarters of Converse Inc., the retro sneaker maker.

It took a year to dry out and waterproof the basement of the Hoffman Building.

The top two floors were found to be structurally unsound; they were replaced with a brick-clad story and two floors in glass and structural steel. Wood reclaimed from the old wharf, polished concrete floors, and exposed columns added to the “industrial heritage” of the finished structure. 

 

PROJECT SUMMARY 

 

Silver Award Winner | Boston, Mass.

Building Team: The Architectural Team (submitting firm, architect); Related Beal (owner); Jennifer Carpenter Architect (interior architect); McNamara Salvia (SE); AHA Consulting Engineer (MEP); and Suffolk Construction (GC/CM).

Details: 220,000 sf. Construction cost: Confidential. Construction time: December 2012 to April 2015. Delivery method: Design-bid-build.

Related Stories

Reconstruction Awards | Nov 13, 2017

Harlem Renaissance: A vacant school provides much-needed housing and a clubhouse for children

Word that PS 186 might be demolished brought out the preservationists, whose letter-writing campaign gained the support of the New York Landmarks Conservancy.

Reconstruction Awards | Nov 16, 2016

BD+C's 2016 Reconstruction Award Winners

St. Patrick’s Cathedral, Lovejoy Wharf, and the Bay Area Metro Center are just a few of the projects recognized as 2016 Reconstruction Award winners.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum

The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Massachusetts Maritime Academy

The two-story “overbuild” employed block and plank construction with drag strut detailing to connect it to the existing building.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: The Masonic Temple

The building team suspended a new eighth-floor mezzanine and added 18 9x15-foot windows to the north, south, and west façades.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: San Francisco War Memorial Veterans Building

The building team used a system of rocking concrete shear walls, which eliminated the need for deep foundations and reduced the shear force on each wall.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Arc at Old Colony

The Arc at Old Colony's vintage floor plans, voluminous lobby, and myriad elevators were perfect for redevelopment as a historically charming residential building.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Noble Chapel

In May 2013 the 124-year-old Noble Chapel, suffered a three-alarm fire that almost completely destroyed its 1937 crematorium.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021