flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Facility completes at Drexel University College of Medicine at Tower Health

University Buildings

New Facility completes at Drexel University College of Medicine at Tower Health

SLAM designed the project.


By David Malone, Managing Editor | January 6, 2022
Drexel main entrance
Photos: SLAM

A new 180,000-sf, six-story facility has completed at the Drexel University College of Medicine at Tower Health in Wyomissing, Penn.

The new facility features enhanced teaching and learning environments with appropriately sized instructional labs, five simulation in-patient rooms, one surgery simulation room, 12 clinical training exam rooms, and an anatomy laboratory. The simulation training will afford students the opportunity to test their knowledge and complex decision-making skills.

Drexel Atrium

Academic life will be balanced by a student life experience that promotes health and wellness through access to a fitness center with indoor and outdoor recreation space. Students will also have access to the Information Commons, a lounge area, a game room, and a cafe.

Drexel interior

Spaces were designed with flexibility and technology to reconfigure as medical education, research, innovation, and collaboration evolves. The facility offers an open environment with “touchdown space” to encourage staff and faculty from other locations to stay and work at the building. Large, open general purpose space, including a 120-seat auditorium, is available for receptions, donor events, and graduations.

SLAM’s integrated team provided full architectural design services, programming/planning, interior design, structural engineering, and landscape architecture.

Cantilevered edge of new Drexel building

Related Stories

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1 - default
boombox2 -
native1 -

More In Category



Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021