flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Facility completes at Drexel University College of Medicine at Tower Health

University Buildings

New Facility completes at Drexel University College of Medicine at Tower Health

SLAM designed the project.


By David Malone, Managing Editor | January 6, 2022
Drexel main entrance
Photos: SLAM

A new 180,000-sf, six-story facility has completed at the Drexel University College of Medicine at Tower Health in Wyomissing, Penn.

The new facility features enhanced teaching and learning environments with appropriately sized instructional labs, five simulation in-patient rooms, one surgery simulation room, 12 clinical training exam rooms, and an anatomy laboratory. The simulation training will afford students the opportunity to test their knowledge and complex decision-making skills.

Drexel Atrium

Academic life will be balanced by a student life experience that promotes health and wellness through access to a fitness center with indoor and outdoor recreation space. Students will also have access to the Information Commons, a lounge area, a game room, and a cafe.

Drexel interior

Spaces were designed with flexibility and technology to reconfigure as medical education, research, innovation, and collaboration evolves. The facility offers an open environment with “touchdown space” to encourage staff and faculty from other locations to stay and work at the building. Large, open general purpose space, including a 120-seat auditorium, is available for receptions, donor events, and graduations.

SLAM’s integrated team provided full architectural design services, programming/planning, interior design, structural engineering, and landscape architecture.

Cantilevered edge of new Drexel building

Related Stories

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

| Aug 7, 2012

McCarthy tops out LEED Platinum-designed UCSD Health Sciences Biomedical Research Facility

New laboratory will enable UCSD to recruit and accommodate preeminent faculty.

| Jul 25, 2012

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.

| Jul 24, 2012

Military Housing firm announces expansion into student housing

The company has partnered with the military to build, renovate and manage nearly 21,000 homes with more than 65,000 bedrooms, situated on more than 10,000 acres of land nationwide.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 11, 2012

Perkins+Will designs new home for Gateway Community College

Largest one-time funded Connecticut state project and first designed to be LEED Gold.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

boombox1 - default
boombox2 -
native1 -

More In Category



Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021