Apple Park, the $5 billion Apple headquarters building in Cupertino, Calif., is as futuristic an office as you are likely to find. In order to create a sleek, futuristic aesthetic for employees, the complex’s design incorporated an extensive amount of glass walls and partitions. While the glass helps to create an open, airy floor plan, there appears to be an unintended consequence to all of the transparent walls.
As CBS San Francisco reports, employees are having difficulty seeing the glass walls and, as a result, are running into them, often times injuring themselves. That’s right, while some new buildings such as U.S. Bank Stadium in Minnesota have had issues with their extensive use of glass proving harmful to bird populations, Apple’s new campus is proving just as difficult to navigate for its human employees.
On more than one occasion calls have been placed to 911 describing employees that are bleeding or disoriented after colliding with the partitions. The current solution for the deleterious walls has been to stick small white stickers on the glass panes to help make them more visible. Whether a more permanent solution will be found remains to be seen.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| Jun 1, 2012
AIA 2030 Commitment Program reports new results
The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.
| May 31, 2012
Product Solutions June 2012
Curing agents; commercial faucets; wall-cladding systems.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 5, 2012
5 tips for a successful door and window retrofit
An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 3, 2012
Blaine Brownell on innovative materials applications in architecture
Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.