flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Move, lift, restore: Repurposing a former post office near San Francisco

Projects

Move, lift, restore: Repurposing a former post office near San Francisco

A Bay Area project integrates a historic structure into an office and retail development.


By Novid Parsi, Contributing Editor | March 3, 2022
Post Office
The new and office retail building will be moved back to its former site in 2023.

In mid-February, a construction crew began lifting a 1940s post office building located in Burlingame, Calif., on the San Francisco Peninsula. The crew moved the 1,010-ton structure about 120 feet away so that a new underground parking garage can be built directly beneath the post office’s historic site, while a new office and retail development, 220 Park Road, will be built above it.

Post Office Reconstruction
Reconstruction began on a 1940 building in February.

In 2023, after undergoing restoration, the post office will be moved back to its former site, where it will be integrated into the new office and retail building, designed by KSH Architects. It will then have a second life as a ground-floor restaurant space at the base of the 220 Park Road office and retail development.

As the preservation architect, Page & Turnbull collaborated with KSH Architects and general contractor Garden City Construction to safely move the structure. The new development is a joint venture of Sares Regis Group of Northern California and Dostart Development Company.

“This post office is part of the historic fabric of the city of Burlingame, and we are honored to help ensure the preservation and adaptation of this public treasure,” says architect Ruth Todd, principal of Page & Turnbull, and the project’s preservation leader, in a statement.

Garden City Construction is joined by construction manager Devcon Construction, structural engineer IMEG, and civil engineer BKF. The mechanical, electrical, and plumbing engineering is performed, respectively, by Silicon Valley Mechanical, Rex Moore, and KDS Plumbing.

The project broke ground in September. When it’s complete, the long-vacant, 1.3-acre lot in the center of downtown Burlingame will be home to 185,000 square feet of new office and retail space. The repurposed post office then will open onto the new adjacent Burlingame Town Square, scheduled to begin construction right after the completion of 220 Park.

Related Stories

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 11, 2012

Perkins+Will designs new home for Gateway Community College

Largest one-time funded Connecticut state project and first designed to be LEED Gold.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jul 3, 2012

Summit Design+Build completes Emmi Solutions HQ

The new headquarters totals 20,455 sq. ft. and features a loft-style space with exposed masonry and mechanical systems, 17-ft clear ceilings, two large rooftop skylights, and private offices with full glass partition walls.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021