flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Katerra has plans for a new advanced manufacturing factory in California

Building Automation

Katerra has plans for a new advanced manufacturing factory in California

The building components facility will be located near rail, shipping ports, and freeways.


By David Malone, Associate Editor | July 13, 2018
Automated robot arm
Automated robot arm

Katerra, a construction technology company, recently revealed plans to build an advanced manufacturing factory in California’s Central Valley. The Tracy, Calif., facility will produce building components such as wall panels, floor systems, roof truss assemblies, windows, cabinets, and finishes.

The 577,000-sf, factory will complement Katerra’s existing California operations, including its headquarters in Menlo Park and office in San Francisco. The new facility will differ from Katerra’s first, located in Phoenix, Ariz., by including significantly more automation, including fully automated wood frame wall production lines, automated floor lines, automated cabinet and finish areas, automated roof truss lines, an automated window line, and a light gauge steel production line.

 

See Also: Katerra, a tech-driven GC, plots ambitious expansion

 

The new facility will be located near rail, shipping ports, and freeways and create more than 500 jobs for the area. Production is slated to begin in 2019. Katerra is also in the process of building a mass timber manufacturing facility in Spokane, Wash., that will produce cross-laminated timber wall panels and floor systems when it becomes operational in 2019.

 

Related Stories

| May 15, 2012

National Tradesmen Day set for Sept. 21

IRWIN Tools invites the nation to honor "The Real Working Hands that Build America and Keep it Running Strong".

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 8, 2012

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.

| May 8, 2012

Morgan/Harbour completes three projects at Columbia Centre

Projects completed on behalf of property owner, White Oak Realty Partners, LLC, Pearlmark Realty Partners, LLC and Angelo Gordon & Co.

| May 7, 2012

4 more trends in higher-education facilities

Our series on college buildings continues with a look at new classroom designs, flexible space, collaboration areas, and the evolving role of the university library.

| May 7, 2012

Best AEC Firms: MHTN Architects nine decades of dedication to Utah

This 65-person design firm has served Salt Lake City and the state of Utah for the better part of 90 years.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021