flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Hotel construction pipeline reaches six-year high

Hotel Facilities

Hotel construction pipeline reaches six-year high

After a three-year bottoming formation, the pipeline for hotel construction has posted five consecutive quarters of double-digit year-over-year growth.


By Lodging Econometrics | March 4, 2015
Hotel construction pipeline reaches six-year high

The number of units under construction is up 37% by projects and 34% by rooms, according to Lodging Econometrics. Photo: Abdul-Jawad Elhusuni via Wikimedia Commons

Lodging Econometrics reports that with 3,645 projects (totaling 460,551 rooms), the 2014 total U.S. lodging construction pipeline stands at its highest level in six years.

After a three-year bottoming formation, the pipeline has now posted five consecutive quarters of double-digit year-over-year (YOY) growth. In both the third and fourth quarters, increases were particularly impressive, exceeding 20%.

Although the breakout might appear robust, pipeline totals are still a long way from the peak of 5,438 projects/718,387 rooms set in 2007.

Projects under construction, the most important predictor of near-term supply growth, has catapulted forward to 1,086 projects/136,442 rooms—the highest level in more than five years. The number of units under construction is up 37% by projects and 34% by rooms (YOY).

 

 

Projects scheduled to start construction in the next 12 months have risen strongly, to 1,351 projects/160,061 rooms, up 17% and 13% YOY, respectively.

The growing number of projects in early planning is only just beginning. The cyclical bottom for projects in early planning just occurred in the second quarter of 2014. It bounced back smartly in the second half of the year, adding 221 projects, and ended 2014 at 1,208 projects/164,048 rooms.

Projects in early planning directly influence the number of hotels that will open three to five years outward. Projects that enter the pipeline in early planning are generally larger hotels in downtown or resort locations. Most are upscale select-service projects, while others are upper upscale and luxury full-service hotels that are frequently part of mixed-use developments.

Planning and permitting these larger, more complex projects is typically more protracted and also comes with longer construction periods. These projects generally open near the end of a real estate cycle, often times after the cycle has already peaked and begun to decline. 

Project counts in early planning are expected to spurt forward over the next two to three years and make significant additions to new supply towards the end of the decade.

Related Stories

| May 21, 2013

7 tile trends for 2013: Touch-sensitive glazes, metallic tones among top styles

Tile of Spain consultant and ceramic tile expert Ryan Fasan presented his "What's Trending in Tile" roundup at the Coverings 2013 show in Atlanta earlier this month. Here's an overview of Fasan's emerging tile trends for 2013.

| May 20, 2013

Jones Lang LaSalle: All U.S. real estate sectors to post gains in 2013—even retail

With healthier job growth numbers and construction volumes at near-historic lows, real estate experts at Jones Lang LaSalle see a rosy year for U.S. commercial construction.

| May 16, 2013

Chicago unveils $1.1 billion plan for DePaul arena, Navy Pier upgrades

Hoping to send a loud message that Chicago is serious about luring tourism and entertainment spending, Mayor Rahm Emanuel has released details of two initiatives that have been developing for more than a year and that it says will mean $1.1 billion in investment in the McCormick Place and Navy Pier areas.

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Apr 24, 2013

Los Angeles may add cool roofs to its building code

Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is also asking the Department of Water and Power (LADWP) to create incentives that make it financially attractive for homeowners to install cool roofs.

| Apr 2, 2013

6 lobby design tips

If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby, here are six principles from healthcare lobby design that make for happier users—and more satisfied owners.

| Mar 29, 2013

Detroit's historic Whitney Building to be renovated for hotel, apartments

Detroit's David Whitney Building, a 19-story landmark erected in 1915, will be renovated for an Aloft hotel and apartments.

| Mar 15, 2013

7 most endangered buildings in Chicago

The Chicago Preservation Society released its annual list of the buildings at high risk for demolition.

| Mar 14, 2013

25 cities with the most Energy Star certified buildings

Los Angeles, Washington, D.C., and Chicago top EPA's list of the U.S. cities with the greatest number of Energy Star certified buildings in 2012.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021