flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Hotel construction pipeline reaches six-year high

Hotel Facilities

Hotel construction pipeline reaches six-year high

After a three-year bottoming formation, the pipeline for hotel construction has posted five consecutive quarters of double-digit year-over-year growth.


By Lodging Econometrics | March 4, 2015
Hotel construction pipeline reaches six-year high

The number of units under construction is up 37% by projects and 34% by rooms, according to Lodging Econometrics. Photo: Abdul-Jawad Elhusuni via Wikimedia Commons

Lodging Econometrics reports that with 3,645 projects (totaling 460,551 rooms), the 2014 total U.S. lodging construction pipeline stands at its highest level in six years.

After a three-year bottoming formation, the pipeline has now posted five consecutive quarters of double-digit year-over-year (YOY) growth. In both the third and fourth quarters, increases were particularly impressive, exceeding 20%.

Although the breakout might appear robust, pipeline totals are still a long way from the peak of 5,438 projects/718,387 rooms set in 2007.

Projects under construction, the most important predictor of near-term supply growth, has catapulted forward to 1,086 projects/136,442 rooms—the highest level in more than five years. The number of units under construction is up 37% by projects and 34% by rooms (YOY).

 

 

Projects scheduled to start construction in the next 12 months have risen strongly, to 1,351 projects/160,061 rooms, up 17% and 13% YOY, respectively.

The growing number of projects in early planning is only just beginning. The cyclical bottom for projects in early planning just occurred in the second quarter of 2014. It bounced back smartly in the second half of the year, adding 221 projects, and ended 2014 at 1,208 projects/164,048 rooms.

Projects in early planning directly influence the number of hotels that will open three to five years outward. Projects that enter the pipeline in early planning are generally larger hotels in downtown or resort locations. Most are upscale select-service projects, while others are upper upscale and luxury full-service hotels that are frequently part of mixed-use developments.

Planning and permitting these larger, more complex projects is typically more protracted and also comes with longer construction periods. These projects generally open near the end of a real estate cycle, often times after the cycle has already peaked and begun to decline. 

Project counts in early planning are expected to spurt forward over the next two to three years and make significant additions to new supply towards the end of the decade.

Related Stories

Hotel Facilities | Nov 10, 2017

The hotel of the future has just the right amount of tech

CallisonRTKL’s recent survey helps shed some light on how the hotel of the future might strike a balance between tech and the human touch.

Mixed-Use | Oct 19, 2017

Mixed-use Dubai tower will have the world’s tallest ceramic facade

The 63-story tower will house a Mandarin Oriental hotel, residences, and restaurants.

Hotel Facilities | Oct 6, 2017

This year’s Radical Innovation Award winners showcase portable and flexible hotel designs

The grand prize hotel concept gives new meaning to “back to nature.” 

Codes and Standards | Sep 1, 2017

U.S. markets with the largest hotel construction pipeline

New York has the largest hotel construction pipeline of any U.S. market.

Hotel Facilities | Aug 29, 2017

The Whitby Hotel in New York City emphasizes natural daylight in crowded Midtown Manhattan

The hotel’s uniquely deep foundation allows the building to have extensive amenity space.

Hotel Facilities | Aug 17, 2017

Seattle hotel will be the largest in the Pacific Northwest

The 45-story, 500-foot-tall tower is composed of two primary volumes.

Hotel Facilities | Aug 14, 2017

New W hotel takes a leap in its interior design

The brand’s focus will incorporate aspects of its properties’ surrounding communities.

Products and Materials | Jul 24, 2017

Nu-Wood brackets give 110-year-old hotel another level of distinction

One of the goals during the hotel’s 2014 and 2015 refurbishment was to create a low maintenance exterior. 

Hotel Facilities | Jun 29, 2017

Luxury, plant-covered hotel unveiled for site near the River Seine

Kengo Kuma is designing the hotel, which will feature a large garden and a plant-covered façade. 

Hotel Facilities | Jun 14, 2017

Finalists selected for Radical Innovation award

Original hospitality design concepts lean on enhancing traveler comfort and mobility.  

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021