flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The French Senate doesn’t want your Notre Dame restoration ideas

Reconstruction & Renovation

The French Senate doesn’t want your Notre Dame restoration ideas

France’s Prime Minister Édouard Philippe originally wanted to hold an international competition to redesign the cathedral’s roof.


By David Malone, Associate Editor | June 5, 2019

Courtesy Pixabay

Don’t expect to see the roof of Paris’ Notre Dame Cathedral adorned with an infinity pool or a greenhouse filled with exotic plants in the near future.

After a fire destroyed the building’s spire and much of its roof on the evening of April 15, ideas from both professional and amateur architects and designers alike have been presented for how to restore the centuries-old building. While some have been more realistic than others, the French Senate has decided to put a stop to any theorizing of what is to come.

 

See Also: Notre Dame fire highlights danger of renovating historic structures

 

The Senate recently approved the restoration bill passed by the French Parliament, but added a clause that states the Cathedral must be rebuilt and restored to its last known visual condition. Additionally, the bill allows work on the project to be completed before the Paris Olympics begin in 2024, a timeframe that some fear is too accelerated and concerned more with politics than careful historical restoration.

Due to the changes made in the bill, the Senate and the Assemblée nationale must now come to an agreement on a version of the bill before it can become law, according to The Local, a European news site.

Related Stories

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021