flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Fast-growing Austin adds a $3 billion community

Projects

Fast-growing Austin adds a $3 billion community

The Uptown ATX development will span 66 acres and include 2.9 million square feet of multifamily units.


By Novid Parsi, Contributing Editor | March 22, 2022
Uptown ATX Community
Uptown ATX will cost about $3 billion.

The nation’s fastest-growing large metro area is getting even bigger, with the addition of a $3 billion, 66-acre community. In Austin, Texas, construction has begun on the master-planned Uptown ATX development. The project will introduce workspace, multifamily, retail, hospitality, and a new metro rail station to what’s being called Austin’s second downtown. 

Uptown ATX will transform what used to be a single-use, auto-centric office complex into a transit-oriented, mixed-use neighborhood, part of a burgeoning technology hub in Northwest Austin. Uptown ATX will feature 3.2 million square feet of workspace, 2.9 million square feet of multifamily units, 600,000 square feet of retail and hospitality, and 11 acres of public open space. It also will include a new metro rail station, providing a mass transit connection to downtown Austin and the larger region.

Uptown ATX neighborhood
Uptown ATX is a complete mixed-use neighborhood.
Aerial view
Aerial view.

Since 2019, SWA/Balsley, supported by Austin-based Coleman & Associates, has been collaborating with Brandywine Realty Trust, Trammell Crow Residential, and a multidisciplinary team of designers, planners, and engineers on the public realm of Uptown ATX. The SWA Balsley team is designing and implementing the project’s streetscapes, seven public parks and plazas, and amenity terraces for two development blocks. 

The SWA/Balsley team’s various landscape projects, currently in design or construction, include Walnut Springs Lake Park, one of Uptown ATX’s signature open spaces. The lake’s central water body will function as a combination detention-retention pond that captures, stores, and cleans much of the development’s stormwater runoff. Other landscape projects include a 40,000-square-foot terrace uniting an office tower and a residential tower, as well as pedestrian-oriented streetscapes and a public park serving a multifamily complex with 529 units.

Lake Park aerial
Lake Park is one of Uptown ATX signature open spaces.

Uptown ATX is owned by Brandywine Realty Trust, with one section co-owned by Trammel Crowe Residential. Page Southerland Page and GFF Architects provide the architectural services. The civil engineer is Kimley-Horn; MEP engineer, Jordan & Skala; structural engineers, Walter P Moore and Viewtech, Inc.; and general contractor, White Construction (with more engineers and contractors to be announced).

Related Stories

| Jun 11, 2014

David Adjaye’s housing project in Sugar Hill nears completion

A new development in New York's historic Sugar Hill district nears completion, designed to be an icon for the neighborhood's rich history.

| Apr 8, 2014

Fire resistive curtain wall helps The Kensington meet property line requirements

The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 21, 2014

2013: The year of the super-tall skyscraper

Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.

| Sep 23, 2013

Six-acre Essex Crossing development set to transform vacant New York property

A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Feb 28, 2013

Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ

Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.

| Feb 27, 2013

Bronx residents get LEED Platinum public housing complex, rooftop farm

The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021