Sponsored Content Walls and Partitions

Experience Possibilities: The Linq Hotel and Casino

Architectural vision, fabrication know-how and ALPOLIC® materials transform the Las Vegas dreamscape.


June 4, 2015
Experience Possibilities: The Linq Hotel and Casino

High Roller loading area clad in ALPOLIC®/fr

Las Vegas is built on dreams and possibilities. Like the new Linq Promenade. It’s anchored at one end by the High Roller, the world’s tallest observation wheel at 550 feet. At the other end is The Linq Hotel & Casino, a $230 million “play, eat, party” destination that defies all ordinary architectural expectations.

To guests looking for good times, ALPOLIC® materials help make a dreamlike experience possible.

High Roller riders are surrounded by ALPOLIC® materials as they ascend the ramp, then watch their cabin approach through a radiused, tunnel-like channel that adds drama in anticipation of the butterfly-inducing views to come. Heading back to the 2,640-room hotel, guests are greeted by ALPOLIC® materials fabricated into monumental forms and colors, with hardly a straight line or flat surface to be found.

Consider the massive, matching canopies that can be found in various places – for example, over the hotel’s porte-cochère entrance. The fascia of each canopy slopes inward and gets narrower from top to bottom, meeting the convex radius of the structure’s ceiling. Every panel joins its neighbors perfectly from multiple directions, in multiple planes.

Some canopies feature oculus openings that let in sunlight and provide a view of the High Roller and other overhead features. For these, ALPOLIC® panels were tapered to fit the radius of the canopy, given a convex radius to fit the interior of the oculus, then lowered into place and glued to a narrow band around the opening.

“Vortex” deck and canopy, clad in ALPOLIC® materials

One of The Linq’s most striking features is the roof deck used for fashion shows, concerts and private events. It features a central “vortex” of colorful LED lights suspended between the deck and overhead canopy. These, too, are clad with ALPOLIC® materials fabricated to create complex tapers and radiuses that give the structure the feeling of a waterspout forming over ocean waves.

The deck is supported at the outside corner by a 30-foot cigar-shaped column, echoing the design of the columns that support canopies throughout the development. Each pair of panels has a compound radius that varies from top to bottom, designed and fabricated to fit perfectly together when lowered into place layer by layer.

The project uses three panel colors – silver metallic, champagne metallic and mica platinum – installed in patterns to create an enchanting, subtly dimensional effect. Because these are directional finishes, fabricators needed to make sure each panel was in the correct orientation before cutting, shaping and marking for installation position.

It all comes together beautifully, as if the details were dreamed into being. But it’s real, and in every aspect The Linq reveals what’s truly possible – thanks to the design vision of Klai Juba Wald Architects, the fabrication ingenuity of Engineered Wall Systems, Inc., and the remarkable versatility of ALPOLIC® materials.

Related Stories

| Jun 23, 2014

Firestone Building Products reveals 2014 Red Shield Metal Wall Systems certified contractors

Twenty-five top-performing firms honored as certified contractors.

| Jun 11, 2014

Koolhaas’ OMA teams with chemical company to study link between color and economy

Dutch company AkzoNobel is partnering with Rem Koolhaas' firm OMA to study how the application of colorful paints and coatings can affect a city's economic development.

Sponsored | | Mar 25, 2014

Johns Hopkins chooses SLENDERWALL for a critical medical facility reconstruction

After decades of wear, the hand-laid brick envelope of the Johns Hopkins nine-story Nelson/Harvey inpatient facility began failing. SLENDERWALL met the requirements for renovation.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 7, 2014

Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]

The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.

| Mar 4, 2014

How EIFS came to America

Design experts from Hoffmann Architects offer a brief history of exterior insulation and finish systems in the U.S.

| Feb 5, 2014

CENTRIA Redefines Coating System with Versacor® Elite

The Versacor Elite Coating System is a premium metal coating system that provides the highest level of protection in the harshest climatic or environmental conditions.

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 7, 2014

Concrete solutions: 9 innovations for a construction essential

BD+C editors offer a roundup of new products and case studies that represent the latest breakthroughs in concrete technology.

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021