flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Engineered for extremes: Talan Towers

Building Team Awards

Engineered for extremes: Talan Towers

Bronze Award: Astana’s shimmering mixed-use towers are made to stand up to the region’s harsh, long winters.


By David Barista, Editorial Director | May 23, 2018

Verny Capital / Astana Property Management

When it comes to extreme weather, only one other capital city across the globe (Ulaanbaatar, Mongolia) faces harsher winter conditions than Astana, Kazakhstan. Astana’s average annual temperature is 38 F, with long, dry, bitterly cold winters that regularly reach −22 F to −31 F between November and March. During the summer months, it’s not unusual for temperatures to soar above 90 F, making for wild seasonal temperature swings.     

Astana’s extreme conditions, combined with the region’s fairly remote location, placed numerous obstacles in front of the Building Team for the Talan Towers development. This 1.36 million-sf mixed-use project brings several “firsts” to this budding capital city, including its first Class A office space and its first luxury hotel, the Astana – The Ritz-Carlton.

The development comprises a 30-story office tower and a 26-story residential and hotel tower, linked by a three-story podium containing retail outlets. Three restaurants, an events center, and a spa and fitness center round out the programming.

To ensure that the building’s façade would stand up to the harsh conditions, including average wind speeds of about 10 mph, the exterior design models were tested in wind tunnels by German wind engineering firm Wacker Ingenieure. The curtain wall façade was fitted with floor-to-ceiling, triple-glazed units engineered to keep the cold and solar heat transmission at bay, while allowing natural light to flood the interior. The interior spaces are adorned with warm materials—marble, wood, gold motif—that contrast with the cold weather outside.   

Finding qualified contractors and suppliers was a major concern for the project team, since local expertise was in short supply. Turner assembled a team of mostly global consultants from diverse geographical regions—Australia, Austria, Finland, Germany, Italy, Jordan, Latvia, Serbia, South Korea, U.S., U.K., and the United Arab Emirates—who co-located in Astana for the duration of the project. Daily “war room” meetings, weekly “look-ahead” programs, and monthly workshops helped to keep the project on schedule.

 

As Astana’s first luxury mixed-use development, Talan Towers features interior spaces adorned with opulent materials and detailing, including custom marble and gold motif. Verny Capital / Astana Property Management.

 

Building Team — Submitting firm, construction manager Turner International Owners Verny Capital, Astana Property Management Architect Skidmore, Owings & Merrill Architect of record Light House Kazakhstan Interior architects CallisonRTKL UK (retail), Perkins+Will UK (offices, common areas), Richmond (hotel) MEP, structural engineer Design Grup General contractor Renaissance Construction CJSC

General Information — Size 1.36 million sf Construction cost Confidential at client’s request Construction time September 2013 to December 2017 Delivery method Design-bid-build, with CM

 

RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE

Related Stories

Building Team Awards | Jun 14, 2017

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.

Building Team Awards | Jun 14, 2017

A space for all: Lighthouse for the Blind and Visually Impaired

Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.

Building Team Awards | Jun 13, 2017

Government campus reimagined: Intelligence Community Campus

Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Building Team Awards | Jun 12, 2017

Circles and squares: Faena Arts Center

Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.

Building Team Awards | Jun 12, 2017

The right prescription: University of North Dakota School of Medicine & Health Sciences

Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.

Building Team Awards | Jun 12, 2017

Texas technopark: TechnipFMC John T. Gremp Campus

Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.

Building Team Awards | Jun 8, 2017

Quick turnaround: Partners HealthCare

Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.

Building Team Awards | Jun 8, 2017

Raising the bar: Zurich North American Headquarters

Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.

Building Team Awards | Jun 8, 2017

Team win: Clemson University Allen N. Reeves Football Operations Complex

Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021