flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Engineered for extremes: Talan Towers

Building Team Awards

Engineered for extremes: Talan Towers

Bronze Award: Astana’s shimmering mixed-use towers are made to stand up to the region’s harsh, long winters.


By David Barista, Editorial Director | May 23, 2018

Verny Capital / Astana Property Management

When it comes to extreme weather, only one other capital city across the globe (Ulaanbaatar, Mongolia) faces harsher winter conditions than Astana, Kazakhstan. Astana’s average annual temperature is 38 F, with long, dry, bitterly cold winters that regularly reach −22 F to −31 F between November and March. During the summer months, it’s not unusual for temperatures to soar above 90 F, making for wild seasonal temperature swings.     

Astana’s extreme conditions, combined with the region’s fairly remote location, placed numerous obstacles in front of the Building Team for the Talan Towers development. This 1.36 million-sf mixed-use project brings several “firsts” to this budding capital city, including its first Class A office space and its first luxury hotel, the Astana – The Ritz-Carlton.

The development comprises a 30-story office tower and a 26-story residential and hotel tower, linked by a three-story podium containing retail outlets. Three restaurants, an events center, and a spa and fitness center round out the programming.

To ensure that the building’s façade would stand up to the harsh conditions, including average wind speeds of about 10 mph, the exterior design models were tested in wind tunnels by German wind engineering firm Wacker Ingenieure. The curtain wall façade was fitted with floor-to-ceiling, triple-glazed units engineered to keep the cold and solar heat transmission at bay, while allowing natural light to flood the interior. The interior spaces are adorned with warm materials—marble, wood, gold motif—that contrast with the cold weather outside.   

Finding qualified contractors and suppliers was a major concern for the project team, since local expertise was in short supply. Turner assembled a team of mostly global consultants from diverse geographical regions—Australia, Austria, Finland, Germany, Italy, Jordan, Latvia, Serbia, South Korea, U.S., U.K., and the United Arab Emirates—who co-located in Astana for the duration of the project. Daily “war room” meetings, weekly “look-ahead” programs, and monthly workshops helped to keep the project on schedule.

 

As Astana’s first luxury mixed-use development, Talan Towers features interior spaces adorned with opulent materials and detailing, including custom marble and gold motif. Verny Capital / Astana Property Management.

 

Building Team — Submitting firm, construction manager Turner International Owners Verny Capital, Astana Property Management Architect Skidmore, Owings & Merrill Architect of record Light House Kazakhstan Interior architects CallisonRTKL UK (retail), Perkins+Will UK (offices, common areas), Richmond (hotel) MEP, structural engineer Design Grup General contractor Renaissance Construction CJSC

General Information — Size 1.36 million sf Construction cost Confidential at client’s request Construction time September 2013 to December 2017 Delivery method Design-bid-build, with CM

 

RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE

Related Stories

Architects | Jan 18, 2016

EHDD’s Monterey Bay Aquarium wins AIA Twenty-five Year Award

The aquarium set new technical standards for the building type, which still influence today, such as the flow-through seawater-based heat pump system, naturalistic exhibitions, and corrosion protection.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021