flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

DOE launches $2 million prize to advance cost-effective, energy-efficient commercial windows

Windows and Doors

DOE launches $2 million prize to advance cost-effective, energy-efficient commercial windows

The inaugural Building Envelope Innovation Prize targets novel solutions for commercial window upgrades to enable equitable decarbonization and optimize building envelopes for electrification.


By Peter Fabris, Contributing Editor | February 28, 2024
DOE launches $2 million prize to advance cost-effective, energy-efficient commercial windows
Illustration of an energy-efficient secondary glazing system being installed in a commercial building with minimal disruption. Graphic by Al Hicks, NREL

The U.S. Department of Energy launched the American-Made Building Envelope Innovation Prize—Secondary Glazing Systems. The program will offer up to $2 million to encourage production of high-performance, cost-effective commercial windows. 

The inaugural Building Envelope Innovation Prize targets novel solutions for commercial window upgrades to enable equitable decarbonization and optimize building envelopes for electrification, according to a DOE news release.

Secondary glazing involves installing an additional windowpane on an existing window to improve insulation.

“About 40% of U.S. commercial buildings, including multifamily residences, have single-pane windows, which are uncomfortable for occupants and waste energy,” says Jeff Marootian, principal deputy assistant secretary for energy efficiency and renewable energy. “Yet less than 1% of commercial buildings get full window replacements each year because it is so expensive and disruptive for occupants. Secondary glazing systems can help solve this problem.”

“While secondary glazing systems currently exist, they are a small portion of the market and are not widely adopted, despite costing markedly less than a full window replacement,” says Marc LaFrance, windows technology manager for DOE’s Building Technologies Office. “This prize will improve equitable access to efficient retrofit technologies by reducing product and installation costs.”

Here are more details from DOE: 
Secondary glazing systems currently on the market can improve energy efficiency without needing to remove existing windows, but the potential of this technology has not been fully realized. The goal of this prize is to spur development of next-generation secondary windows that increase building resilience and comfort and decrease energy consumption—all while being highly cost-effective.

Improved window energy efficiency will lead to more attainable building electrification, as smaller heat pumps will be able to serve the building’s reduced energy needs. The Building Envelope Innovation Prize aims to fund development of promising, cost-effective, market-ready secondary glazing system solutions across three phases:

Phase 1: Design Concept—$50,000 | February 14 to June 13, 2024

  • Teams will provide an innovative concept narrative and design drawings for a secondary glazing system prototype, including details on cost and energy performance.
  • Up to five semifinalists will be selected, each receiving $50,000.
  • Phase 1 awards will be based on energy and technical performance modeling, cost metrics, and construction plans.
  • Teams can only join during Phase 1

Phase 2: Prototype—$200,000 | September 2024 to March 2025

  • Semifinalist teams selected from Phase 1 will submit a secondary glazing system prototype and technical narrative as well as secure an equity-focused pilot demonstration partner.
  • Phase 2 focus areas will include market readiness, cost-effectiveness, and the ability to be deployed.
  • Up to three finalists will be selected, each receiving $200,000.
  • Phase 2 awards will be based on prototype construction, as well as thermal and optical performance tests run by a national laboratory.

Phase 3: Commercialization—$750,000 | May 2025 to May 2026

  • Finalist teams selected from Phase 2 will work with their equity-focused pilot demonstration partners and submit plans for commercialization. 
  • Phase 3 will focus on commercial viability—including price point, ease of installation, etc.
  • Up to two winners will be selected. First place will receive $750,000; second place will receive $400,000.
  • Phase 3 awards will be based on prototype durability testing results, rigor of commercialization plans, and implementation of equity-focused pilot demonstrations in low-income multifamily or underserved public sector buildings.

The Design Concept phase will accept applications of innovative secondary glazing system designs through June 13, 2024. All interested applicants must join by that date; Phase 2 and Phase 3 will not accept new competitors. 

Related Stories

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Sep 23, 2011

Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida

Fire and hurricane assemblies meet design and code requirements.

| Sep 23, 2011

Smart windows installed at NREL

The self-tinting heat-activated filter allows solar heat into the building when it is desired, such as on a sunny winter day. 

| Sep 23, 2011

$5M pledge renewed for Habitat for Humanity

The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 20, 2011

PPG, Pleotint to co-market environmentally adaptive glazing technology with low-e glass

 Laminated between two lites of glass, SRT interlayer may be used monolithically or within an insulating glass unit. 

| Jul 22, 2011

High-performance windows and doors

Learning objectives After reading this article, you should be able to: Understand issues of thermal performance and energy efficiency in relation to window and door systems; describe optimal detailing of the window-wall interface and how it contributes to building performance, sustainability, and occupant well-being; understand how durability contributes to sustainable windows/doors; and list sustainable O&M requirements for window and door systems.

| May 4, 2011

SAFTI FIRST to debut free apps for iPhone, iPod Touch, and iPad at AIA Convention

SAFTI FIRST, manufacturer of fire rated glass and framing solutions, will debut its mySAFTI app, the first interactive design tool that takes the guesswork out of choosing the correct fire rated glass product, at the AIA National Convention in New Orleans, May 12-14. Visit booth1634.

| Apr 22, 2011

AAMA releases voluntary tornado specification

As tornado season escalates and increased tornado activity has devastated parts of the Midwest and the South during he past few weeks, the American Architectural Manufacturers Association (AAMA) has released a voluntary specification for testing and rating building components that will be exposed to tornados and similar extreme wind and rain conditions.

| Apr 19, 2011

Is a building sustainable if it kills birds?

Migratory birds were flying into the windows and falling, dead or injured, to the foot of the LEED-Platinum FBI building in Chicago. The FBI building isn't the only LEED-certified structure to cause problems for migratory birds, however. Some of the more than 33,000 LEED-certified buildings in the U.S. use large amounts of glass to bring in natural light and save on energy—and all that glass can confuse birds.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021