Creative Engineering Works Out for the YMCA

Sponsored Content Metals

Creative Engineering Works Out for the YMCA


By STAR BUILDING SYSTEMS | September 7, 2021

The new multimillion dollar, 22,000+ sq. ft. multipurpose YMCA community facility in Shelton, Washington, is a dream come true for Mason County residents—one that contributes to the community’s deeply held civic pride. With a stated goal of strengthening communities through healthyliving and social responsibility, the project owner—South Sound YMCA (a leading nonprofit) —set out to create a full-service, state-of-the-art community center in Shelton where people could come and enjoy a host of fitness amenities, including aquatics, camps, wellness workshops and other sports activities. The facility, which consists of five custom-engineered Star Building Systems buildings, opened its doors in March 2021,and features a gymnasium, locker rooms, cardio equipment, free weights, yoga and cycling studios, basketball and volleyball courts, in addition to a covered outdoor pool.

As reported by the Shelton-Mason County Chamber of Commerce (October 2020), Aubree Fudge, Senior Director of the Shelton Family YMCA branch emphasized that the center would serve as much more than a gym. The Chamber noted that Fudge “likened it to a community hub; a friendly outlet for physical, social and financial fitness … designed to be a safe, family-friendly destination that encourages mind-body balance and love for mankind.”  

To achieve the project goals and create the ambitiously practical yet welcoming open space, the talented and innovative team of designers and erectors from Bahnmiller Construction Inc., a firm that specializes in pre-engineered metal building (PEMB), worked alongside Star Building Systems. 

Product-wise, Star provided the pre-engineered framing (multi span building, double slope with tapered columns) and 22,437 sq. ft. of metal roof panels for the multiple roofs (singles and gables), which were Double-Lok® in Weathered Bronze, an earth tone hue selected to meet the owner’s preference. Perhaps most importantly, though, Star added its engineering expertise to help navigate the ins and outs of the challenging project.

In keeping with its overall mission to support its building partners throughout a project’s lifecycle, the Star team took tremendous pride in empowering Bahnmiller to advance its business through strong personal relationships and exemplary customer service, as well as comprehensive estimating tools and access to design tools and technology—in particular, providing the resources needed for a “do it yourself” approach.

David Verret, Project Manager and Estimator for Bahnmiller, explains that this was a design-build project right from the start, which gave them a good amount of time to do the planning with the architectural team and the structural team in order to make sure everything worked cohesively. He states, “The expectation of the owner was first and foremost about dollars. The project was originally designed as Glulam beam, and the decision was made early on to switch it to pre-engineered for cost efficiency. That’s where we got involved. We're a full-service pre-engineered supply and erector company. We specialize in high complexity, challenging projects. Those are the jobs that we're known for being successful on … and that we most enjoy.” 

To that end, the biggest challenge on this project, according to Verret, was the profile of the building—the low eave and the spans. He shares, “The layout was not your typical 60- x 120-ft. pre-engineered building. This was made up of four or five building components and each building was offset from the other. And so, due to where the mainframes were located, we had to really try creative engineering to solve some of the structural challenges.”

Verret credits Bahnmiller Construction’s relationship with Star for blending and aiding in that creative process, providing a great advantage. “Star was flexible ... and not so flexible,” he muses, adding, “we're dealing with pre-engineered steel, which, no pun intended, is very rigid in the engineering process. But if it's managed and communicated correctly and you can have open communication, you can try to be creative with the engineering process. That's what Star did. They really stepped up and helped out with some of the serviceability issues with the architect's needs and translated those into a successful structure.”

The project consisted of multiple buildings with symmetrical 12’-6” eave heights and a 1/12 single slope 30-ft. low eave at the gym. Verret explains, “We ended up with about 6-ft. headroom after some of the rafters were engineered. That’s really where the creative design and engineering had to come in to take that 6-ft.-deep rafter and make it more functional, turning it into 2-1/2 or 3 feet.” Additionally, rigid insulation (R-Seal) at walls/multiple façade reveals and trims were used in conjunction with the Star products. 

“The big thing,” says Verret,“was trying to deliver a pre-engineered building that allowed for mechanical and lighting engineers to put their products and their systems into it so that there was seamless coordination with the pre-engineered components. With Star’s help, we were able to achieve that goal. In the end, everyone involved appreciated the efforts and loves the building. The owner is excited to bring the multi-use facility to the community.”

In addition to being a community hub for connection, the Shelton YMCA received even further recognition by winning Star’s 2020 Builder’s Choice Master Builder of the Year award. 


GC: FORMA Construction Co
Architect: Foster and William
Builder: Bahnmiller Construction, Inc.

Star Products:
Pre-engineered framing: Multi span building, double slope with tapered columns
Roof Panels: Double-Lok, Weathered Bronze, 22,437 square footage

Tags

Related Stories

Sponsored | | Oct 13, 2014

Think you can recognize a metal building from the outside?

It’s getting more and more difficult to spot a metal building these days. What looks like brick, stucco or wood on the outside could actually be a metal building in disguise. SPONSORED CONTENT

Sponsored | | Sep 30, 2014

How project managers can manage technology

Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT

| Sep 24, 2014

5 business lessons from a 43-year Star veteran

Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT

| Jul 21, 2014

16 utility questions to answer during your building project

We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT

Sponsored | | Jul 17, 2014

A major hop forward

The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.

| Jul 17, 2014

22 land questions to decide if your build site works

When you’re ready to build, land needs a serious amount of attention. Since it can singlehandedly shift your building plans, land must be investigated, questioned, and eyed from every angle. SPONSORED CONTENT

| Jul 9, 2014

The one misstep that could be slowing your company’s growth

Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT

| May 27, 2014

Contractors survey reveals improving construction market

The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT

| May 11, 2014

8 starter questions to answer when thinking about building

So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT

| Apr 25, 2014

A radiant barrier FAQ: Everything you wanted to know but were afraid to ask

There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021