Creative Engineering Works Out for the YMCA

Sponsored Content Metals

Creative Engineering Works Out for the YMCA


By STAR BUILDING SYSTEMS | September 7, 2021

The new multimillion dollar, 22,000+ sq. ft. multipurpose YMCA community facility in Shelton, Washington, is a dream come true for Mason County residents—one that contributes to the community’s deeply held civic pride. With a stated goal of strengthening communities through healthyliving and social responsibility, the project owner—South Sound YMCA (a leading nonprofit) —set out to create a full-service, state-of-the-art community center in Shelton where people could come and enjoy a host of fitness amenities, including aquatics, camps, wellness workshops and other sports activities. The facility, which consists of five custom-engineered Star Building Systems buildings, opened its doors in March 2021,and features a gymnasium, locker rooms, cardio equipment, free weights, yoga and cycling studios, basketball and volleyball courts, in addition to a covered outdoor pool.

As reported by the Shelton-Mason County Chamber of Commerce (October 2020), Aubree Fudge, Senior Director of the Shelton Family YMCA branch emphasized that the center would serve as much more than a gym. The Chamber noted that Fudge “likened it to a community hub; a friendly outlet for physical, social and financial fitness … designed to be a safe, family-friendly destination that encourages mind-body balance and love for mankind.”  

To achieve the project goals and create the ambitiously practical yet welcoming open space, the talented and innovative team of designers and erectors from Bahnmiller Construction Inc., a firm that specializes in pre-engineered metal building (PEMB), worked alongside Star Building Systems. 

Product-wise, Star provided the pre-engineered framing (multi span building, double slope with tapered columns) and 22,437 sq. ft. of metal roof panels for the multiple roofs (singles and gables), which were Double-Lok® in Weathered Bronze, an earth tone hue selected to meet the owner’s preference. Perhaps most importantly, though, Star added its engineering expertise to help navigate the ins and outs of the challenging project.

In keeping with its overall mission to support its building partners throughout a project’s lifecycle, the Star team took tremendous pride in empowering Bahnmiller to advance its business through strong personal relationships and exemplary customer service, as well as comprehensive estimating tools and access to design tools and technology—in particular, providing the resources needed for a “do it yourself” approach.

David Verret, Project Manager and Estimator for Bahnmiller, explains that this was a design-build project right from the start, which gave them a good amount of time to do the planning with the architectural team and the structural team in order to make sure everything worked cohesively. He states, “The expectation of the owner was first and foremost about dollars. The project was originally designed as Glulam beam, and the decision was made early on to switch it to pre-engineered for cost efficiency. That’s where we got involved. We're a full-service pre-engineered supply and erector company. We specialize in high complexity, challenging projects. Those are the jobs that we're known for being successful on … and that we most enjoy.” 

To that end, the biggest challenge on this project, according to Verret, was the profile of the building—the low eave and the spans. He shares, “The layout was not your typical 60- x 120-ft. pre-engineered building. This was made up of four or five building components and each building was offset from the other. And so, due to where the mainframes were located, we had to really try creative engineering to solve some of the structural challenges.”

Verret credits Bahnmiller Construction’s relationship with Star for blending and aiding in that creative process, providing a great advantage. “Star was flexible ... and not so flexible,” he muses, adding, “we're dealing with pre-engineered steel, which, no pun intended, is very rigid in the engineering process. But if it's managed and communicated correctly and you can have open communication, you can try to be creative with the engineering process. That's what Star did. They really stepped up and helped out with some of the serviceability issues with the architect's needs and translated those into a successful structure.”

The project consisted of multiple buildings with symmetrical 12’-6” eave heights and a 1/12 single slope 30-ft. low eave at the gym. Verret explains, “We ended up with about 6-ft. headroom after some of the rafters were engineered. That’s really where the creative design and engineering had to come in to take that 6-ft.-deep rafter and make it more functional, turning it into 2-1/2 or 3 feet.” Additionally, rigid insulation (R-Seal) at walls/multiple façade reveals and trims were used in conjunction with the Star products. 

“The big thing,” says Verret,“was trying to deliver a pre-engineered building that allowed for mechanical and lighting engineers to put their products and their systems into it so that there was seamless coordination with the pre-engineered components. With Star’s help, we were able to achieve that goal. In the end, everyone involved appreciated the efforts and loves the building. The owner is excited to bring the multi-use facility to the community.”

In addition to being a community hub for connection, the Shelton YMCA received even further recognition by winning Star’s 2020 Builder’s Choice Master Builder of the Year award. 


GC: FORMA Construction Co
Architect: Foster and William
Builder: Bahnmiller Construction, Inc.

Star Products:
Pre-engineered framing: Multi span building, double slope with tapered columns
Roof Panels: Double-Lok, Weathered Bronze, 22,437 square footage

Tags

Related Stories

| Apr 17, 2014

6 details that can throw off your schedule

In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Reflecting on job number 61-001

Job number 61-001 changed everything. It was sold in 1961, a year of change for the nation and for Star. By January, John F. Kennedy would be president. By the end of the year, Star would launch a historic shift in our product and our distribution, a shift still active today.

| Mar 31, 2014

Tips for creating a competitive bid using codes and loads

Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?

| Mar 26, 2014

A sales and service showcase

High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

| Mar 11, 2014

Why you should start with a builder, part three

We had worked together for 30 years. As a long-standing client of mine, he and I had gone through many projects together. And we were approaching another project, one that would forever change how he viewed our working relationship. As my customer and I sat down to talk about the project details, he told me something that would stay with me for weeks. “Kim, I’m going to have to get other bids on this just so I have peace of mind.”

Sponsored | | Mar 10, 2014

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.

| Mar 4, 2014

CENTRIA Demonstrates Commitment to Contractors

New Brochure Highlights Architectural Metal Panel Manufacturer’s Products, Expertise and Experience

| Feb 27, 2014

Colorado Coalition Plans Welcoming Events for METALCON International Visitors

Visitors to the 24th METALCON International, slated for October 1-3 at the Colorado Convention Center in Denver, will get a royal welcome from local companies involved in the show. Denver-based New Tech Machinery and Colorado Springs-based S-5! Solutions have formed the Colorado Coalition as a way of encouraging visitors to learn about Colorado before they arrive and for Coloradans to experience METALCON.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021