flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Brown University tops off first housing building in three decades

Coronavirus

Brown University tops off first housing building in three decades

The facility, scheduled for completion next April, will combine a residence hall with student health services.


By John Caulfield, Senior Editor | June 18, 2020

Among the infection-control protocols that Shawmut Design and Construction rolled out on the Brown University project is Shawmut Vitals, which allows workers to self-certify daily health screenings by scanning a job-specific QR code. Image: Shawmut 

Brown University in Providence, R.I., earlier this month celebrated the virtual topping off of a 96,000-sf wellness center and 162-bed residence hall that, when they open for the fall semester in 2021, will be inside the first new building in Brown’s housing portfolio in 30 years.

The facility is designed to meet LEED v4 Silver standards using Fitwel and WELL certification systems as guidelines. The building will bring together several services for student mental and physical wellbeing, including Health Services, Counseling and Psychological Services, Brown Emergency Medical Services, and BWell, the university’s health promotion program.  

The project is part of a strategic sourcing program between Brown University and the construction management firm Shawmut Design and Construction, which is completing this building in partnership with the architecture firm William Rawn Associates. Brown states on its website that the building is a prototype implementation of the vision and principles underlying the university’s Undergraduate Housing Master Plan update (2018).

STEEL-MASS TIMBER STRUCTURE

This photo shows the exterior construction progress that includes a cross-laminated timber deck. Image: Shawmut

 

The building features a hybrid system of steel framing and cross-laminated timber that will lower the structure’s carbon footprint. The building’s approach to sustainability make it “a one-of-a-kind residential and academic experience that will be a model for holistic student learning and engagement,” said Ron Simoneau, Shawmut’s executive vice president of Education, in a prepared statement.

This project’s Building Team includes LeMessurier Consultants (SE), Vanasse Hangen Brustline (CE), Stephen Stimon Associates (landscape), Accentech (acoustics), Jensen Hughes (code/fire alarm/fire protection), The Green Engineer (sustainability), Adelman and Lelek Engineering (energy modeling), GZA Environmental (Geotech), Environmental Systems (HVAC), Sterling Engineering (EE), and Harry Grodsky & Co. (PE).

The residence hall, on the upper floors of the building, will include a mix of single bedrooms and four-person suites. The health services will be co-located on the lower floors along with the student-led EMS department. (The building will have five floors on its south side, where the ambulance bay is located, and four floors on its north side. The site slopes 12.5 ft from south to north.)

COVID-19 RISK MITIGATION PROTOCOLS

A rendering of Brown University's new Wellness Center and residence hall, which will be ready for the 2021 fall semester. Image: William Rawn Associates

 

The building will have natural wood ceilings and a visible wood deck. All building systems are electric, and mechanical systems will have energy recovery technology, aligning with Brown’s pledge to reduce campus greenhouse gas emissions to net-zero by 2040.

On this project, Shawmut has rolled out new procedures to minimize the potential risk from the coronavirus. These include protocols such as Shawmut Vitals, a custom technology platform that allows team members to self-certify daily health screenings by scanning a job-specific QR code and completing a health survey. Workers have their temperatures before being allowed onsite and are issued personal protection equipment.

A spokesperson for Shawmut tells BD+C that the Building Team was still reviewing possible adjustments to the building’s design that would abet infection control. The building already incorporates a “ramped up” air ventilation and filtration system with the wellness center integration, this spokesperson says.

Neither Brown University nor Shawmut disclosed the cost of this building.

Related Stories

Healthcare Facilities | Jun 20, 2022

Is telehealth finally mainstream?

After more than a century of development, telehealth has become a standard alternative for many types of care.

Coronavirus | May 20, 2022

Center for Green Schools says U.S. schools need more support to fight COVID-19

  The Center for Green Schools at the U.S. Green Building Council released a new report detailing how school districts around the country have managed air quality within their buildings during the second year of the COVID-19 pandemic.

Industry Research | Mar 9, 2022

Survey reveals five ways COVID-19 changed Americans’ impressions of public restrooms and facilities

Upon entering the third year of the pandemic, Americans are not only more sensitive to germs in public restrooms, they now hold higher standards for the cleanliness, condition and technology used in these shared spaces, according to the annual Healthy Handwashing Survey™ from Bradley Corporation conducted in January. 

Codes and Standards | Feb 21, 2022

New standard for ultraviolet germicidal irradiation

The Illuminating Engineering Society (IES) recently introduced the standard, ANSI/IES RP-44-21 Recommended Practice: Ultraviolet Germicidal Irradiation.

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

Coronavirus | Jul 20, 2021

5 leadership lessons for a post-pandemic world from Shawmut CEO Les Hiscoe

Les Hiscoe, PE, CEO of Shawmut, a $1.5 billion construction management company headquartered in Boston, offers a 5-point plan for dealing with the Covid pandemic.

Resiliency | Jul 15, 2021

A new report urges federal investment in healthier buildings

The National Institute of Building Sciences also calls for code changes and greater cooperation between building owners and the AEC community.

Multifamily Housing | Jul 7, 2021

Make sure to get your multifamily amenities mix right

​One of the hardest decisions multifamily developers and their design teams have to make is what mix of amenities they’re going to put into each project. A lot of squiggly factors go into that decision: the type of community, the geographic market, local recreation preferences, climate/weather conditions, physical parameters, and of course the budget. The permutations are mind-boggling.

Multifamily Housing | Jun 30, 2021

A post-pandemic ‘new normal’ for apartment buildings

Grimm + Parker’s vision foresees buildings with rentable offices and refrigerated package storage.

Multifamily Housing | Jun 23, 2021

COVID-19’s impact on multifamily amenities

Multifamily project teams had to scramble to accommodate the overwhelming demand for work-from-home spaces for adults and study spaces for children. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021